[11350] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Building 16 Air Handler 1

daemon@ATHENA.MIT.EDU (Hasan Sharif)
Wed Oct 21 14:16:28 1992

Date: Wed, 21 Oct 92 14:19:09
From: has@MIT.EDU (Hasan Sharif)
To: shutdowns@Athena.MIT.EDU

The building 16 air handler 1 A & B supply fans will be shut down on 
Saturday the 24th from 7:30am to 5:30pm. This means no ventilation from 
the basement all the way up to the 7th floor.

home help back first fref pref prev next nref lref last post