| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
Date: Wed, 21 Oct 92 14:19:09 From: has@MIT.EDU (Hasan Sharif) To: shutdowns@Athena.MIT.EDU The building 16 air handler 1 A & B supply fans will be shut down on Saturday the 24th from 7:30am to 5:30pm. This means no ventilation from the basement all the way up to the 7th floor.
| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |