[10334] in Hotline Meeting
Shutdowns
daemon@ATHENA.MIT.EDU (jjmorey@Athena.MIT.EDU)
Thu Aug 27 16:06:14 1992
From: jjmorey@Athena.MIT.EDU
To: hotline@Athena.MIT.EDU
Date: Thu, 27 Aug 92 16:05:59 EDT
------- Forwarded Message
Received: from MIT.MIT.EDU by po7.MIT.EDU (5.61/4.7) id AA16286; Thu, 27 Aug 92 13:00:08 EDT
Received: from BIGREDONE.MIT.EDU by MIT.EDU with SMTP
id AA26520; Thu, 27 Aug 92 12:59:59 EDT
Message-Id: <9208271659.AA26520@MIT.EDU>
Date: Thu, 27 Aug 92 12:11:22 EST
From: burke@MIT.EDU (Jerry Burke)
To: network@MIT.EDU, ops@MIT.EDU, dcns-cluster@MIT.EDU, errol@MIT.EDU
Subject: Re: scheduled shutdown?
Cc: mory@MIT.EDU
> From: jenglos@Athena.MIT.EDU
> To: burke@Athena.MIT.EDU
> Subject: scheduled shutdown?
> Date: Tue, 25 Aug 92 16:59:23 EDT
>
> Mary Fiels from Operations Center called about a shutdown between
> Thrusday evening and Friday morning for E15-540. It's a fan supply
> shutdown...actually 4 shutdowns, two which will affect air circulation
> and 2 which will affect building-return-air. Each down for two hours.
> Her number is 3-1500.
>
> I couldn't find you so Steve said to send this before notifying
> hotline, network, or op....
>
> Jennifer
> Network Help Desk
Cleared these .. Jerry
e15-540 all ventilation will re-schedule
Bldg. 14 air handling air for east side 7am Friday
Bldg. 1 chilled water 357, 353, 347a b 7am to 3pm Friday
Bldg. 13 fan exhaust hoods 8 fans 1 to 2 hours/each Sept. 3
Bldg. 62 East side all electric power and lighting 1hour Sept. 3
Bldg. 64 East all electric power and lighting 1hour Sept 3.
56 basement and 1st floor supply 10am to 11am August 31.
Bldg 36 8:30 to 10am just labs supply fan Sept. 3
Mary Files 1500
E20 Fri Aug 28 Shutdown of Supplied air for approx 15mins.
To replace filter 11:30am-11:45am.
Bldg 35 change filters in two supply fans services 1st floor and
basement 10am to 10:45am
------- End of Forwarded Message