[10133] in Hotline Meeting
Emergency Shutdown Bldg. 6
daemon@ATHENA.MIT.EDU (jjmorey@Athena.MIT.EDU)
Fri Aug 14 08:30:16 1992
From: jjmorey@Athena.MIT.EDU
To: carlton@Athena.MIT.EDU
Cc: dcns-cluster@Athena.MIT.EDU, joanne@Athena.MIT.EDU,
Date: Fri, 14 Aug 92 08:29:46 EDT
Mary Files called and reported that supply fan unit 2 in bldg. 6
will be shut down for repairs. This fan cools floors 3&4 on the
South side of the bldg. So there will be no cooling starting Now
untill repairs complete.
I comfirmed shutdown on our end.
JJ