[700] in I/T Delivery

home help back first fref pref prev next nref lref last post

Data Warehouse - January Status Report

daemon@ATHENA.MIT.EDU (Mary Weisse)
Tue Feb 12 06:24:52 2002

Message-Id: <4.3.2.7.2.20020212061238.0312c7e8@hesiod>
Date: Tue, 12 Feb 2002 06:26:30 -0500
To: Robert Ferrara <rferrara@mit.edu>, delivery@mit.edu
From: Mary Weisse <mca@MIT.EDU>
Cc: thorne@mit.edu
In-Reply-To: <5.0.2.1.2.20010803164611.00acd5f0@po9.mit.edu>
Mime-Version: 1.0
Content-Type: multipart/alternative;
	boundary="=====================_82594905==_.ALT"

--=====================_82594905==_.ALT
Content-Type: text/plain; charset="iso-8859-1"; format=flowed
Content-Transfer-Encoding: quoted-printable

Team Name: Data Warehouse
Team Leader: Scott Thorne
Report Date: February 12, 2002
URL: http://web.mit.edu/warehouse/


This month's accomplishments (January 2002)

=B7       Completed the Student Payroll data prototype and rolled it out for=
=20
user testing (CAO).
=B7       Completed the Settlement Rule data prototype and rolled it out for=
=20
user testing (CAO and FSS).
=B7       Continued analysis work on the new SAP/HR implementation (with HR=
=20
team).
=B7       Completed the acquisition piece of the Library system prototype=
 and=20
demonstrated it to the Library users.
=B7       Continued development of the AAUDE Data Warehouse phase one.
=B7       Revised specification, modified data structure, and reloaded data=
=20
for Sloan School of Management Student Revenue project.
=B7       Tested migration to Oracle 8 on Taj and Orca (neither complete).
=B7       Investigated problem with some faculty missing from the=20
appointments tables. The business rules implemented in the warehouse load=20
needs to be clarified/corrected. On hold waiting for Personnel to get back=
=20
to us.
=B7       Created draft web GL Account list report.
=B7       Modified Personnel data loads to include Directory Department=
 field=20
in test database. Waiting for feedback from Personnel before proceeding=20
with move to production.
=B7       Loaded missing web hits data from December.
=B7       Investigated question about calculation of age in warehouse. This=
=20
field is supplied by Personnel, not calculated in the warehouse.
=B7       Fixed performance problem on the employee view.
=B7       Created announcements mailing list (warehouse-anounce@mit.edu) for=
=20
informing users of warehouse problems/outages/information. Users will be=20
invited to subscribe to the list.
=B7       Some users are having a problem getting to the AAUDE FTP site=
 using=20
certain web browsers. Asked ASST about possibility of turning on FTP=20
logging so we can investigate the problem further. Waiting for response=20
from ASST.
=B7       Loaded time_day data.
=B7       Started modifying web hits load in the test database to recognize=
=20
hits from Windows XP (currently they are lumped with Windows 2000).
=B7       Continue  investigating reporting tools.



Next Month's Plans (February 2002)

=B7       Continue to work on the analysis and implementation of Library=20
system data.
=B7       Continue to work on the analysis of the HR implementation in the=
=20
warehouse.
=B7       Waiting for user feedback to resume/complete Student Payroll and=
=20
Settlement Rules.
=B7       Continue development of the AAUDE Data Warehouse phase one.
=B7       Continue development of the Financial Aid Federal Work Study.
=B7       Reinstall Oracle 8 on Taj.
=B7       Complete web GL Account list report.
=B7       Work with DS to create an Oracle install template for DW and other=
=20
systems.   Test Oracle during rescheduled upgrade.
=B7       Move Directory Department changes into production.
=B7       Work on AAUDE FTP problems with ASST.
=B7       Complete web hits "Windows XP" change.
=B7       Complete telephone Billing and variance report of IS Finance and=
 JDB.
=B7       Continue with the hiring process for Programmer Analyst II=
 position.
=B7       Continue working with the Benefits office on HR/Benefit reporting.
=B7       Continue  investigating reporting tools.






Issues

Two of above tasks awaiting response from Personnel. One of above tasks=20
awaiting
response from ASST.



--=====================_82594905==_.ALT
Content-Type: text/html; charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<html>
<b>Team Name</b>: Data Warehouse<br>
<b>Team Leader:</b> Scott Thorne<br>
<b>Report Date:</b> February 12, 2002<br>
<b>URL:</b>
<a href=3D"http://web.mit.edu/warehouse/" eudora=3D"autourl"><font=
 color=3D"#0000FF"><u>http://web.mit.edu/warehouse/</a><br>
<br>
<br>
</u></font><b>This month's accomplishments (January 2002)<br>
<br>
</b><font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Completed the Student Payroll data prototype and rolled it out for user=
 testing (CAO).<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Completed the Settlement Rule data prototype and rolled it out for user=
 testing (CAO and FSS).<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continued analysis work on the new SAP/HR implementation (with HR=
 team).<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Completed the acquisition piece of the Library system prototype and=
 demonstrated it to the Library users.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continued development of the AAUDE Data Warehouse phase one.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Revised specification, modified data structure, and reloaded data for Sloan=
 School of Management Student Revenue project.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Tested migration to Oracle 8 on Taj and Orca (neither complete).<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Investigated problem with some faculty missing from the appointments=
 tables. The business rules implemented in the warehouse load needs to be=
 clarified/corrected. On hold waiting for Personnel to get back to us. <br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Created draft web GL Account list report.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Modified Personnel data loads to include Directory Department field in test=
 database. Waiting for feedback from Personnel before proceeding with move=
 to production.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Loaded missing web hits data from December.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Investigated question about calculation of age in warehouse. This field is=
 supplied by Personnel, not calculated in the warehouse.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Fixed performance problem on the employee view. <br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Created announcements mailing list (warehouse-anounce@mit.edu) for=
 informing users of warehouse problems/outages/information. Users will be=
 invited to subscribe to the list.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Some users are having a problem getting to the AAUDE FTP site using certain=
 web browsers. Asked ASST about possibility of turning on FTP logging so we=
 can investigate the problem further. Waiting for response from ASST.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Loaded time_day data.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Started modifying web hits load in the test database to recognize hits from=
 Windows XP (currently they are lumped with Windows 2000).<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continue <font face=3D"Arial, Helvetica"> investigating reporting=
 tools.<br>
<br>
<br>
<br>
</font><b>Next Month's Plans (February 2002)<br>
<br>
</b><font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continue to work on the analysis and implementation of Library system=
 data.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continue to work on the analysis of the HR implementation in the=
 warehouse.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Waiting for user feedback to resume/complete Student Payroll and Settlement=
 Rules<font face=3D"Symbol" size=3D5>.<br>
=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Continue=
 development of the AAUDE Data Warehouse phase one.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continue development of the Financial Aid Federal Work Study.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Reinstall Oracle 8 on Taj.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Complete web GL Account list report.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Work with DS to create an Oracle install template for DW and other=
 systems.&nbsp;&nbsp; Test Oracle during rescheduled upgrade.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Move Directory Department changes into production.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Work on AAUDE FTP problems with ASST.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Complete web hits &quot;Windows XP&quot; change.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>C<font face=3D"Arial, Helvetica">omplete telephone Billing and variance=
 report of IS Finance and JDB.<br>
</font><font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continue with the hiring process for Programmer Analyst II position.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continue working with the Benefits office on HR/Benefit reporting.<br>
<font face=3D"Symbol"=
 size=3D5>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font=
>Continue <font face=3D"Arial, Helvetica"> investigating reporting=
 tools.<br>
<br>
<br>
<br>
<br>
<br>
<br>
</font><b>Issues<br>
<br>
</b>Two of above tasks awaiting response from Personnel. One of above tasks=
 awaiting<br>
response from ASST.<br>
<br>
<br>
</html>

--=====================_82594905==_.ALT--


home help back first fref pref prev next nref lref last post