Late Winter/Early Spring W20 power outage...

daemon@ATHENA.MIT.EDU (John Hawkinson)
Fri Feb 24 12:21:16 1995

Date: Fri, 24 Feb 1995 12:19:50 -0500
To: sipb-staff@MIT.EDU, star-maintainers@MIT.EDU
In-Reply-To: "[1778] in Physical Plant Shutdowns"
From: John Hawkinson <jhawk@MIT.EDU>

From the shutdowns mailing list:

} From: jjmorey@MIT.EDU
} To: shutdowns@MIT.EDU
} Date: Fri, 24 Feb 1995 10:05:22 EST
} ------- Forwarded Message
}  
} Received: from PACIFIC-CARRIER-ANNEX.MIT.EDU by po8.MIT.EDU (5.61/4.7) id AA02846; Fri, 24 Feb 95 09:41:02 EST
} Received: from MITVMA.MIT.EDU by MIT.EDU with SMTP
} 	  id AA22649; Fri, 24 Feb 95 09:40:44 EST
} Received: from MITVMA.MIT.EDU by mitvma.mit.edu (IBM VM SMTP V2R2)
}    with BSMTP id 1220; Fri, 24 Feb 95 09:40:28 EST
} Received: from MITPPL.BITNET (NJE origin MFILES@MITPPL) by MITVMA.MIT.EDU
}  (LMail V1.2a/1.8a) with BSMTP id 3624; Fri, 24 Feb 1995 09:40:27 -0500
} Received: from MITPPL.BITNET by MITPPL.BITNET (PMDF #12255) id
}  <01HNF8RY14GW8WZXUC@MITPPL.BITNET>; Fri, 24 Feb 1995 09:40 EDT
} Date: Fri, 24 Feb 1995 09:40 EDT
} From: MFILES%MITPPL.BITNET@mitvma.mit.edu
} Subject: UPCOMING POWER SHUTDOWNS IN THE COMMUNITY
} To: PLANT-NOTIFY@MIT.EDU
} Message-Id: <01HNF8RY14GW8WZXUC@MITPPL.BITNET>
} X-Envelope-To: PLANT-NOTIFY@MIT.EDU
} X-Vms-To: IN%"PLANT-NOTIFY@MIT.EDU"
}  
} 	  Please take note of the following message sent from Neil
} Tomlinson of the Electrical Department via Plant-Notify:
}  
} 			  UPCOMING SHUTDOWNS
}  
} 	  The following is a tentative list of electrical shutdowns that
} will be necessary to perform this late winter/early spring.  I will
} probably begin in a week or so.  Realizing the impact loss of power has
} on the community, I thought you would like advance notice of what was
} coming up in your areas, so that you may start preparing.  Please keep
} in mind, the shutdowns will still be cleared through the Operations Center
} as is normal procedure.

[...]

} Building W20:
}  
} 	  This being one of the most sensitive and difficult to schedule,
} we will be very flexible.  Preventive maintenance, testing and cleaning
} are desperately needed on all of the feeder breakers in the main
} switchgear.  It will take close to 20 hours to do all of them.  Most
} shutdowns will be only a half hour or less, but I need a shutdown for
} each breaker.  I anticipate these shutdowns will take place late at
} night, over several nights.

--jhawk