[4161] in North American Network Operators' Group

home help back first fref pref prev next nref lref last post

Re: MAE-East still no generator

daemon@ATHENA.MIT.EDU (Stephen Balbach)
Sun Sep 8 12:46:43 1996

Date: Sun, 8 Sep 1996 12:45:01 -0400 (EDT)
From: Stephen Balbach <stephen@clark.net>
To: Avi Freedman <freedman@netaxs.com>
cc: "James D. Butt 'J.D.'" <jbutt@mwci.net>, nathan@netrail.net,
        nanog@merit.edu
In-Reply-To: <199609080543.BAA26570@netaxs.com>


There is AC battery backup at MAE EAST. With the old P3 MAE EAST there was
a mobile generator on a truck that could be brought in which served
multiple MFS buildings in the Tyson's area, not sure if thats
still the case at P1. There was a power outage on

mae-east uptime is 1 week, 2 days, 23 hours, 22 minutes

time now is Sun Sep  8 12:40:30 EDT 1996

caused by some MFS electrical equipment failure. MAE EAST went to backup
power this Thursday when hurricane Fran moved through NoVA - all our AC
equipment stayed up at MAE EAST presumably on battery backup.

/stb

---
Stephen Balbach  "Driving the Internet To Work"
VP, ClarkNet     due to the high volume of mail I receive please quote
info@clark.net   the full original message in your reply.


home help back first fref pref prev next nref lref last post