[11711] in North American Network Operators' Group
Re: BBN (GTE) Suffers another major power problem.
daemon@ATHENA.MIT.EDU (Jonah Yokubaitis)
Fri Aug 8 17:08:58 1997
Date: Fri, 8 Aug 1997 16:01:23 -0500 (CDT)
From: Jonah Yokubaitis <barron@texas.net>
To: "Matthew F. Ringel" <mringel@bbnplanet.com>
cc: nanog@merit.edu
In-Reply-To: <Pine.SOL.3.95.970808093202.12439B-100000@pasilla.bbnplanet.com>
On Fri, 8 Aug 1997, Matthew F. Ringel wrote:
|Um, actually, it was out longer than that. The power was out from 1730
|until roughly 2245, which was when the last of the Cambridge area outside of
|MIT got power back. MIT got power back at around ~2345
So BBN couldn't last 5:15minutes?? What were you using for power
backup? Some lousy AC UPS systems with 55minute runtime?
Jonah