[11699] in North American Network Operators' Group

home help back first fref pref prev next nref lref last post

Re: BBN (GTE) Suffers another major power problem.

daemon@ATHENA.MIT.EDU (Nathan Stratton)
Fri Aug 8 14:42:13 1997

Date: Fri, 8 Aug 1997 14:19:06 +0000 (GMT)
From: Nathan Stratton <nathan@netrail.net>
To: Brian Tackett <cym@acrux.net>
cc: Matthew White <mtw@channel1.com>, nanog@merit.edu
In-Reply-To: <Pine.GSO.3.93.970808100211.20431A-100000@pluto>

On Fri, 8 Aug 1997, Brian Tackett wrote:

> Our solution to this was pretty simple: A gasoline generator and some
> heavy-duty cable :) No idea how that would scale (probably poorly), but at
> least it enabled us to get core services back online.

Try that with 480 volts 3 phase where you need 4 500 MCM cables for each
phase. The nice thing is you can walk in the generator in winter to stay
warm.


Nathan Stratton                             President, CTO, NetRail,Inc.
------------------------------------------------------------------------
Phone   (888)NetRail                           NetRail, Inc.
Fax     (404)522-1939                          230 Peachtree Suite 500
WWW     http://www.netrail.net/                Atlanta, GA 30303
------------------------------------------------------------------------
"No king is saved by the size of his army; no warrior escapes by his
great strength.                                        - Psalm 33:16



home help back first fref pref prev next nref lref last post