[79559] in Hotline Meeting
Bldg. 18 - Fire Protection Water Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jul 2 07:14:33 2004
Message-ID: <568F0AEE7A57D511923900508B556451064EF236@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
"'dms@mit.edu'" <dms@MIT.Edu>, "'jdoughty@mit.edu'" <jdoughty@MIT.Edu>,
"'rjwilk@mit.edu'" <rjwilk@MIT.Edu>, "'swade@mit.edu'" <swade@MIT.Edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 2 Jul 2004 07:14:21 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C46025.B9A12A20"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C46025.B9A12A20
Content-Type: text/plain
> To: A-Zone; Cust-Coach; dms@mit.edu; jdoughty@mit.edu; rjwilk@mit.edu;
> swade@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 18 - Fire Protection Water Shutdown Request
>
>
The following fire protection water shutdown request for Bldg. 18 - 1st
floor (elevator lobby) on Tuesday, July 6, 2004 is for your information and
comment. Would you please let me know whether this does or does not meet
with your approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 18 - 1st floor elevator lobby
> Date: 7/6/2004
> Day: Tuesday
> Time: 7:30 AM - 2:30 PM
> System: Fire Protection Water
> Duration: 7 hours
> Reason:
> Demo existing and install eight new sprinkler heads and piping.
>
> Effect:
> Loss of fire protection water in 18 - 1st floor elevator lobby. The
> Safety Office will be advised of this - that office will notify the Fire
> Department.
>
>
------_=_NextPart_001_01C46025.B9A12A20
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 18 - Fire Protection Water Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">A-Zone; Cust-Coach; dms@mit.edu; =
jdoughty@mit.edu; rjwilk@mit.edu; swade@mit.edu; =
shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 18 - Fire =
Protection Water Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following fire protection =
water shutdown request for Bldg. 18 - 1st floor (elevator lobby) =
on Tuesday, July 6, 2004 is for your information and comment. =
Would you please let me know whether this does or does not meet with =
your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">18 - 1st floor elevator lobby</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7/6/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Tuesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7:30 AM - 2:30 PM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Fire Protection Water</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">7 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Demo existing and install =
eight new sprinkler heads and piping.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of fire protection water =
in 18 - 1st floor elevator lobby. The Safety Office will be =
advised of this - that office will notify the Fire =
Department.</FONT></P>
<BR>
</BODY>
</HTML>
------_=_NextPart_001_01C46025.B9A12A20--