[79454] in Hotline Meeting
Bldg. 38 - Approved Building Power Shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Jun 30 10:56:38 2004
Message-ID: <568F0AEE7A57D511923900508B556451064EF20A@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: RM-ElecCtl <rm-elecctl@mit.edu>, Joseph Collins
<JCollins@PLANT.MIT.EDU>,
Jim Hunt <jahunt@PLANT.MIT.EDU>,
Manuel Moreira <mmoreira@PLANT.MIT.EDU>,
Scott Stordy
<SStordy@PLANT.MIT.EDU>,
"'edmccann@mit.edu'" <edmccann@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>, B-Zone <B-Zone@mit.edu>,
Billy Homeyer <whomeyer@PLANT.MIT.EDU>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>
Date: Wed, 30 Jun 2004 10:56:20 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C45EB2.67692470"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C45EB2.67692470
Content-Type: text/plain
> To: RM-ElecCtl; Joseph Collins; Jim Hunt; Manuel Moreira; Scott Stordy;
> edmccann@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; B-Zone; Billy Homeyer;
> shutdowns@mit.edu
> Subject: Bldg. 38 - Approved Building Power Shutdown
>
>
The following approved building power shutdown for Bldg. 38 - 117, 145,
161, 173 and entire North side of building - all floors (almost same rooms
as first floor - 245, 261, 273, etc.) on Thursday, July 1, 2004 is for your
information.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 38 - 117, 145, 161, 173 and entire North Side - all floors (same
> rooms as on first floor)
> Date: 7/1/2004
> Day: Thursday
> Time: 5 AM - 7 AM
> System: Building Power/panel 10DLA in 153E, Panel 12LA in 161 & panel 13LA
> in 145; lab equipment + 120/208V receptacles
> Duration: 2 hours
> Reason:
> Install 2 new breakers in panel 10DLA, 208V - 3 phases as well as
> 120/208Volts.
>
> Effect:
> Loss of building power in the above-listed areas. This means that no
> receptacles in labs, computers and lab equipment using either 120 or 208V
> will be operational during the 2-hour shutdown period.
>
>
------_=_NextPart_001_01C45EB2.67692470
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 38 - Approved Building Power Shutdown</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">RM-ElecCtl; Joseph Collins; Jim Hunt; =
Manuel Moreira; Scott Stordy; edmccann@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu; =
rm-shutdown@mit.edu; B-Zone; Billy Homeyer; shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 38 - Approved =
Building Power Shutdown</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following approved =
building power shutdown for Bldg. 38 - 117, 145, 161, 173 and =
entire North side of building - all floors (almost same rooms as first =
floor - 245, 261, 273, etc.) on Thursday, July 1, 2004 is for your =
information.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">38 - 117, 145, 161, 173 and entire =
North Side - all floors (same rooms as on first floor)</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7/1/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Thursday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">5 AM - 7 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Building Power/panel 10DLA in 153E, =
Panel 12LA in 161 & panel 13LA in 145; lab equipment + 120/208V =
receptacles</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">2 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Install 2 new breakers in =
panel 10DLA, 208V - 3 phases as well as 120/208Volts.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of building power in the =
above-listed areas. This means that no receptacles in labs, computers =
and lab equipment using either 120 or 208V will be operational =
during the 2-hour shutdown period.</FONT> </P>