[79378] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. E23 - Air Handlers 8, 9, 10 and 11 Preventive Maintenance S

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Jun 28 14:44:59 2004

Message-ID: <568F0AEE7A57D511923900508B556451064EF1DE@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'bengel@mit.edu'" <bengel@mit.edu>,
        "'brig@med.mit.edu'"
	 <brig@med.mit.edu>,
        "'dwye@med.mit.edu'" <dwye@med.mit.edu>,
        "'fris@med.mit.edu'" <fris@med.mit.edu>,
        "'tquinn@mit.edu'"
	 <tquinn@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Mon, 28 Jun 2004 14:44:36 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C45D3F.F5ECDBC0"

This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C45D3F.F5ECDBC0
Content-Type: text/plain

> To: 	bengel@mit.edu; brig@med.mit.edu; dwye@med.mit.edu;
> fris@med.mit.edu; tquinn@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. E23 - Air Handlers 8, 9, 10 and 11 Preventive
> Maintenance Shutdown Request
> 
> 
The following air handlers 8, 9, 10 and 11 preventive maintenance shutdown
request for Bldg. E23 - River End - floors 1 through 3; Center area floors 1
through 4; E23 Hospital and Atrium Area, and North end of basement and
floors 1 through 5 on Saturday, July 10, 2004 is for your information and
comment.  Would you please let me know whether this does or does not meet
with your approval.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: E23 - River End - floors 1 through 3; Center area floors 1
> through 4; E23 Hospital and Atrium Area, and North end of basement and
> floors 1 through 5
> Date: 7/10/2004
> Day: Saturday
> Time: 7 AM - 11 AM
> System: Air Handlers 8, 9, 10 and 11
> Duration: 4 hours
> Reason: 
> Preventive maintenance work and cleaning air intakes.
> 
> Effect: 
> Loss of supply ventilation, supply cooling and supply heating (via ceiling
> supply fans) in the above-listed areas during the 4-hour preventive
> maintenance shutdown period.
> 
> 

------_=_NextPart_001_01C45D3F.F5ECDBC0
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. E23 - Air Handlers 8, 9, 10 and 11 Preventive Maintenance =
Shutdown Request</TITLE>
</HEAD>
<BODY>

<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">bengel@mit.edu; brig@med.mit.edu; =
dwye@med.mit.edu; fris@med.mit.edu; tquinn@mit.edu; =
shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. E23 - Air =
Handlers 8, 9, 10 and 11 Preventive Maintenance Shutdown Request</FONT>
</P>
<BR>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following air handlers 8, =
9, 10 and 11 preventive maintenance shutdown request for Bldg. E23 - =
River End - floors 1 through 3; Center area floors 1 through 4; E23 =
Hospital and Atrium Area, and North end of basement and floors 1 =
through 5 on Saturday, July 10, 2004 is for your information and =
comment.&nbsp; Would you please let me know whether this does or does =
not meet with your approval.</FONT></P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">E23 - River End - floors 1 through 3; =
Center area floors 1 through 4; E23 Hospital and Atrium Area, and North =
end of basement and floors 1 through 5</FONT></P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7/10/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Saturday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 11 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Air Handlers 8, 9, 10 and 11</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Preventive maintenance work =
and cleaning air intakes.</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of supply ventilation, =
supply cooling and supply heating (via ceiling supply fans) in the =
above-listed areas during the 4-hour preventive maintenance shutdown =
period.</FONT></P>
<BR>

</BODY>
</HTML>
------_=_NextPart_001_01C45D3F.F5ECDBC0--

home help back first fref pref prev next nref lref last post