[79246] in Hotline Meeting
Bldgs. W1 and W13 - All Steam and Condensate Return Shutdown Requ
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jun 25 14:48:06 2004
Message-ID: <568F0AEE7A57D511923900508B556451064EF1C7@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'mwhelan@mit.edu'" <mwhelan@mit.edu>,
"'bailey@mit.edu'"
<bailey@mit.edu>,
"'general@mit.edu'" <general@mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
D-Zone
<D-Zone@mit.edu>
Date: Fri, 25 Jun 2004 14:47:11 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C45AE4.D33E1100"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C45AE4.D33E1100
Content-Type: text/plain
> To: mwhelan@mit.edu; bailey@mit.edu; general@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu; D-Zone
> Subject: Bldgs. W1 and W13 - All Steam and Condensate Return Shutdown
> Request
>
>
The following all steam and condensate return shutdown request for Bldg. W1
and W13 on Wednesday, June 30, 2004 is for your information and comment.
Would you please let me know whether this does or does not meet with your
approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: W1 and W13
> Date: 6/30/2004
> Day: Wednesday
> Time: 9 AM - 7 PM
> System: All Steam/Condensate Return (Hot domestic water/Heating Hot
> Water/Supply Heating)
> Duration: 10 hours
> Reason:
> Installation of new isolation valve.
>
> Effect:
> Loss of all steam and condensate return. This means there will be no hot
> domestic water (for showers, bathroom, kitchen sink faucets) or heating
> hot water (building heat) as well as supply heating (via ceiling supply
> fans in W1 and W13 during the 10 hour shutdown period.
>
>
------_=_NextPart_001_01C45AE4.D33E1100
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldgs. W1 and W13 - All Steam and Condensate Return Shutdown =
Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">mwhelan@mit.edu; bailey@mit.edu; =
general@mit.edu; shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu; D-Zone</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldgs. W1 and W13 - =
All Steam and Condensate Return Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following all steam and =
condensate return shutdown request for Bldg. W1 and W13 on Wednesday, =
June 30, 2004 is for your information and comment. Would you =
please let me know whether this does or does not meet with your =
approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">W1 and W13</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">6/30/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Wednesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">9 AM - 7 PM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">All Steam/Condensate Return (Hot =
domestic water/Heating Hot Water/Supply Heating)</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">10 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Installation of new isolation =
valve.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of all steam and =
condensate return. This means there will be no hot domestic water (for =
showers, bathroom, kitchen sink faucets) or heating hot water (building =
heat) as well as supply heating (via ceiling supply fans in W1 and W13 =
during the 10 hour shutdown period.</FONT></P>
<BR>
</BODY>
</HTML>
------_=_NextPart_001_01C45AE4.D33E1100--