Bldg. 38 - Building Power Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Jun 23 11:13:51 2004
Message-ID: <568F0AEE7A57D511923900508B556451064EF187@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'agallant@mit.edu'" <agallant@mit.edu>,
"'amcgurl@rle.mit.edu'"
<amcgurl@rle.mit.edu>,
B-Zone <B-Zone@mit.edu>, Cust-Coach
<cust-coach@mit.edu>,
"'edc@mit.edu'" <edc@mit.edu>,
"'fletch1@eecs.mit.edu'" <fletch1@eecs.mit.edu>,
"'pmorley@mit.edu'"
<pmorley@mit.edu>,
"'rroscoe@mit.edu'" <rroscoe@mit.edu>,
"'schedule@mit.edu'" <schedule@mit.edu>,
"'wgibbs@rle.mit.edu'"
<wgibbs@rle.mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Wed, 23 Jun 2004 11:13:07 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C45934.96B25EA0"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C45934.96B25EA0
Content-Type: text/plain
> To: agallant@mit.edu; amcgurl@rle.mit.edu; B-Zone; Cust-Coach;
> edc@mit.edu; fletch1@eecs.mit.edu; pmorley@mit.edu; rroscoe@mit.edu;
> schedule@mit.edu; wgibbs@rle.mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 38 - Building Power Shutdown Request
>
>
The following building power shutdown request for Bldg. 38 - 117, 145, 161,
173 and entire North side of building - all floors (almost same rooms as
first floor - 245, 261, 273, etc.) on Friday, July 2, 2004 is for your
information and comment. Would you please let me know whether this does or
does not meet with your approval.
Thank very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 38 - 117, 145, 161, 173 and entire North Side - all floors (same
> rooms as on first floor)
> Date: 7/2/2004
> Day: Friday
> Time: 5 AM - 7 AM
> System: Building Power/panel 10DLA in 153E, Panel 12LA in 161 & panel 13LA
> in 145; lab equipment + 120/208V receptacles
> Duration: 2 hours
> Reason:
> Install 2 new breakers in panel 10DLA, 208V - 3 phases as well as
> 120/208Volts.
>
> Effect:
> Loss of building power in the above-listed areas. This means that no
> receptacles in labs, computers and lab equipment using wither 120 or 208V
> will be operational during the 2-hour shutdown period.
>
>
------_=_NextPart_001_01C45934.96B25EA0
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 38 - Building Power Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">agallant@mit.edu; amcgurl@rle.mit.edu; =
B-Zone; Cust-Coach; edc@mit.edu; fletch1@eecs.mit.edu; pmorley@mit.edu; =
rroscoe@mit.edu; schedule@mit.edu; wgibbs@rle.mit.edu; =
shutdowns@mit.edu</FONT></P>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 38 - Building =
Power Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following building power =
shutdown request for Bldg. 38 - 117, 145, 161, 173 and entire North =
side of building - all floors (almost same rooms as first floor - 245, =
261, 273, etc.) on Friday, July 2, 2004 is for your information and =
comment. Would you please let me know whether this does or does =
not meet with your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank very much.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">38 - 117, 145, 161, 173 and entire =
North Side - all floors (same rooms as on first floor)</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7/2/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Friday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">5 AM - 7 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Building Power/panel 10DLA in 153E, =
Panel 12LA in 161 & panel 13LA in 145; lab equipment + 120/208V =
receptacles</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">2 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Install 2 new breakers in =
panel 10DLA, 208V - 3 phases as well as 120/208Volts.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of building power in the =
above-listed areas. This means that no receptacles in labs, computers =
and lab equipment using wither 120 or 208V will be operational =
during the 2-hour shutdown period.</FONT> </P>