[79061] in Hotline Meeting
Bldg. W85 Control Systems Upgrade Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Jun 22 09:48:09 2004
Message-ID: <568F0AEE7A57D511923900508B556451064EF165@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'bailey@mit.edu'" <bailey@mit.edu>,
"'mlieberm@mit.edu'"
<mlieberm@mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>,
"'mwhelan@mit.edu'" <mwhelan@mit.edu>, "'and'" <general@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Tue, 22 Jun 2004 09:47:44 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C4585F.7E829140"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C4585F.7E829140
Content-Type: text/plain
> To: bailey@mit.edu; mlieberm@mit.edu; shutdowns@mit.edu;
> mwhelan@mit.edu; and
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. W85 Control Systems Upgrade Request
>
>
The following control systems upgrade request for Bldg. W85 (Westgate)
Corridor Make-Up Air via Air Handler 1 (Supply Ventilation - Air from
Outside), Supply Cooling via ceiling supply fans; Hot Water Converter #1
affects Hot Domestic Water - for showers, bathroom, kitchen sink faucets in
W85 Low Rise; exhaust fans 4 and 5 (affects exhaust-general air) on Monday,
June 28, 2004 is for your information and comment. Would you please let me
know whether this does or does not meet with your approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: W85 (Westgate)
> Date: 6/28/2004
> Day: Monday
> Time: 9 AM - 1 PM
> System: Air Handler 1 (Supply Ventilation - Air from Outside), Supply
> Cooling via ceiling supply fans, Hot Water Converter #1 and General
> Exhaust Fans 4 and 5
> Duration: 4 hours
> Reason:
> Control System Upgrade. *Equipment will be shutdown down for 1 hour during
> the shutdown period. This will most likely be from 10 AM to 11 AM.
>
> Effect:
> Loss of supply ventilation (air from outside), supply cooling (via ceiling
> supply fan) in W85 Corridors, hot domestic water (would affect showers,
> bathroom and kitchen sink faucets) and exhaust fans 4 and 5 (would affect
> exhaust-general air in W85 Low Rise.
>
>
------_=_NextPart_001_01C4585F.7E829140
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. W85 Control Systems Upgrade Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">bailey@mit.edu; mlieberm@mit.edu; =
shutdowns@mit.edu; mwhelan@mit.edu; and</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. W85 Control =
Systems Upgrade Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following control systems =
upgrade request for Bldg. W85 (Westgate) Corridor Make-Up Air via =
Air Handler 1 (Supply Ventilation - Air from Outside), Supply Cooling =
via ceiling supply fans; Hot Water Converter #1 affects Hot Domestic =
Water - for showers, bathroom, kitchen sink faucets in W85 Low Rise; =
exhaust fans 4 and 5 (affects exhaust-general air) on Monday, June 28, =
2004 is for your information and comment. Would you please let me =
know whether this does or does not meet with your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">W85 (Westgate)</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">6/28/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Monday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">9 AM - 1 PM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Air Handler 1 (Supply Ventilation - Air =
from Outside), Supply Cooling via ceiling supply fans, Hot Water =
Converter #1 and General Exhaust Fans 4 and 5</FONT></P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Control System Upgrade. =
*Equipment will be shutdown down for 1 hour during the shutdown =
period. This will most likely be from 10 AM to 11 AM.</FONT></P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of supply ventilation =
(air from outside), supply cooling (via ceiling supply fan) in W85 =
Corridors, hot domestic water (would affect showers, bathroom and =
kitchen sink faucets) and exhaust fans 4 and 5 (would affect =
exhaust-general air in W85 Low Rise.</FONT></P>
<BR>
</BODY>
</HTML>
------_=_NextPart_001_01C4585F.7E829140--