[78514] in Hotline Meeting
Bldg. NW21 - Smoke Detector Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jun 11 09:08:24 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D727C2@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: D-Zone <D-Zone@MIT.Edu>, "'hrycaj@psfc.mit.edu'" <hrycaj@psfc.mit.edu>,
"'mfulton@mit.edu'" <mfulton@MIT.Edu>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 11 Jun 2004 09:08:09 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C44FB5.246796E0"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C44FB5.246796E0
Content-Type: text/plain
> To: D-Zone; hrycaj@psfc.mit.edu; mfulton@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. NW21 - Smoke Detector Shutdown Request
>
>
The following smoke detector shutdown request or Bldg. NW21 - 1st floor on
Tuesday, June 15 through Friday, June 18, 2004 is for your information and
comment. Would you please let me know whether this does or does not meet
with your approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: NW21 - 1st floor
> Date: 6/15/2004
> Day: Tuesday
> Time: 7:30 AM - 2:30 PM each day
> System: Smoke Detectors
> Duration: 4 days at 7 hours per day
> Reason:
> Welding steel piping. *Cambrige Fire Department watch detail will be on
> site.*
>
> Effect:
> Loss of smoke detectors in NW21 - 1st floor during the 4-day - 7 hour per
> day shutdown period.
>
>
------_=_NextPart_001_01C44FB5.246796E0
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. NW21 - Smoke Detector Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">D-Zone; hrycaj@psfc.mit.edu; =
mfulton@mit.edu; shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. NW21 - Smoke =
Detector Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following smoke detector =
shutdown request or Bldg. NW21 - 1st floor on Tuesday, June 15 through =
Friday, June 18, 2004 is for your information and comment. Would =
you please let me know whether this does or does not meet with your =
approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">NW21 - 1st floor</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">6/15/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Tuesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7:30 AM - 2:30 PM each day</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Smoke Detectors</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 days at 7 hours per day</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Welding steel piping. =
*Cambrige Fire Department watch detail will be on site.*</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of smoke detectors in =
NW21 - 1st floor during the 4-day - 7 hour per day shutdown =
period.</FONT>
</P>
<BR>
</BODY>
</HTML>
------_=_NextPart_001_01C44FB5.246796E0--