[78386] in Hotline Meeting
Bldg. NW14 - Rescheduled Heating Hot Water/Chilled Water/Air Hand
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Jun 9 08:46:18 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D72798@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'cp-command@mit.edu'" <cp-command@mit.edu>, D-Zone <D-Zone@mit.edu>,
"'devries@mit.edu'" <devries@mit.edu>,
"'galanek@mit.edu'"
<galanek@mit.edu>,
"'hrycaj@psfc.mit.edu'" <hrycaj@psfc.mit.edu>,
"'jcyanch@mit.edu'" <jcyanch@mit.edu>,
"'ldesforg@mit.edu'"
<ldesforg@mit.edu>,
"'mfulton@mit.edu'" <mfulton@mit.edu>, "'mlej@mit.edu'" <mlej@mit.edu>,
"'pbrenton@MIT.EDU'" <pbrenton@mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Wed, 9 Jun 2004 08:46:13 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C44E1F.BF2C22F0"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C44E1F.BF2C22F0
Content-Type: text/plain
> To: cp-command@mit.edu; D-Zone; devries@mit.edu; galanek@mit.edu;
> hrycaj@psfc.mit.edu; jcyanch@mit.edu; ldesforg@mit.edu; mfulton@mit.edu;
> mlej@mit.edu; pbrenton@MIT.EDU; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. NW14 - Rescheduled Heating Hot Water/Chilled Water/Air
> Handler/Supply Fan 2 Shutdown Request
>
>
The following rescheduled heating hot water/chilled water/air handler/supply
fan 2 shutdown request for Bldg. NW14 on Wednesday, June 16, 2004 is for
your information and comment. Would you please let me know whether this
does or does not meet with your approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: NW14
> Date: 6/16/2004
> Day: Wednesday
> Time: 8 AM - 2 PM
> System: Heating Hot Water/Chilled Water/Air Handler/Supply Fan 2
> Duration: 6 hours
> Reason:
> To repair dual temperature lines on 5th floor due to corrosion.
>
> Effect:
> Loss of heating hot water (building heat), chilled water (air
> conditioning), supply ventilation (air from outside), supply cooling and
> supply heating (via ceiling supply fans) in NW14 during the shutdown
> period.
>
>
------_=_NextPart_001_01C44E1F.BF2C22F0
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. NW14 - Rescheduled Heating Hot Water/Chilled Water/Air =
Handler/Supply Fan 2 Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">cp-command@mit.edu; D-Zone; =
devries@mit.edu; galanek@mit.edu; hrycaj@psfc.mit.edu; jcyanch@mit.edu; =
ldesforg@mit.edu; mfulton@mit.edu; mlej@mit.edu; pbrenton@MIT.EDU; =
shutdowns@mit.edu</FONT></P>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. NW14 - =
Rescheduled Heating Hot Water/Chilled Water/Air Handler/Supply Fan 2 =
Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following rescheduled =
heating hot water/chilled water/air handler/supply fan 2 shutdown =
request for Bldg. NW14 on Wednesday, June 16, 2004 is for your =
information and comment. Would you please let me know whether =
this does or does not meet with your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">NW14</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">6/16/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Wednesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">8 AM - 2 PM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Heating Hot Water/Chilled Water/Air =
Handler/Supply Fan 2</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">6 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">To repair dual temperature =
lines on 5th floor due to corrosion.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of heating hot water =
(building heat), chilled water (air conditioning), supply ventilation =
(air from outside), supply cooling and supply heating (via ceiling =
supply fans) in NW14 during the shutdown period.</FONT></P>
<BR>
</BODY>
</HTML>
------_=_NextPart_001_01C44E1F.BF2C22F0--