[78281] in Hotline Meeting
Installation behind Building 38
daemon@ATHENA.MIT.EDU (Ruth Davis)
Mon Jun 7 17:26:20 2004
Message-ID: <568F0AEE7A57D511923900508B55645105EB5BE8@plantnt.facilities.ms.mit.edu>
From: Ruth Davis <rtdavis@PLANT.MIT.EDU>
To: "'plant-notify@mit.edu'" <plant-notify@mit.edu>
Date: Mon, 7 Jun 2004 17:25:59 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C44CD6.06BAE340"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C44CD6.06BAE340
Content-Type: text/plain;
charset="iso-8859-1"
Dear Colleagues,
Please note that scheduled for Wednesday, June 9th beginning at 7:00 a.m.
and lasting throughout the day is the removal of an existing tank and
installation of a new 6000 gal liquid nitrogen tank for the NanoPrecision
Deposition Laboratory.
This work, which will take place behind Building 38, will be very similar to
the work that was performed on May 24th for the installation of the 11,000
gal LN2 tank for Bldg 39.
In order to complete the installation, one access under Building 39 will be
blocked. Police details will be on site to direct traffic and pedestrians
around the work area.
Ruth T. Davis
Manager of Communications and
Assistant to the Director for Special Projects
MIT Department of Facilities
NE49-2200
77 Massachusetts Avenue
Cambridge, MA 02139
Phone: 617-253-7299
Fax: 617-452-2342
Email: rtdavis@mit.edu
------_=_NextPart_001_01C44CD6.06BAE340
Content-Type: text/html;
charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Installation behind Building 38</TITLE>
</HEAD>
<BODY>
<P><FONT SIZE=3D2 FACE=3D"Arial">Dear Colleagues,</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"Arial">Please note that scheduled for =
Wednesday, June 9th beginning at 7:00 a.m. and lasting throughout the =
day is the removal of an existing tank and installation of a new 6000 =
gal liquid nitrogen tank for the NanoPrecision Deposition =
Laboratory. </FONT></P>
<P><FONT SIZE=3D2 FACE=3D"Arial">This work, which will take place =
behind Building 38, will be very similar to the work that was performed =
on May 24th for the installation of the 11,000 gal LN2 tank for Bldg =
39.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"Arial">In order to complete the installation, =
one access under Building 39 will be blocked. Police details will be on =
site to direct traffic and pedestrians around the work area.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"Arial">Ruth T. Davis</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Manager of Communications and</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Assistant to the Director for Special =
Projects</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">MIT Department of Facilities</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">NE49-2200</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">77 Massachusetts Avenue</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Cambridge, MA 02139</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Phone: 617-253-7299</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Fax: 617-452-2342</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Email: rtdavis@mit.edu</FONT>
</P>
</BODY>
</HTML>
------_=_NextPart_001_01C44CD6.06BAE340--