Bldg. E17 - Emergency Power Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Jun 7 11:28:06 2004

Message-ID: <568F0AEE7A57D511923900508B55645103D72774@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'bengel@mit.edu'" <bengel@mit.edu>, "'dreid@mit.edu'" <dreid@mit.edu>,
        E-Zone <E-Zone@mit.edu>, "'jmganno@mit.edu'" <jmganno@mit.edu>,
        "'sdalton@mit.edu'" <sdalton@mit.edu>,
        "'wardd@mit.edu'" <wardd@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        Jim Hunt
	 <jahunt@PLANT.MIT.EDU>,
        "'sstordy@mit.edu'" <sstordy@mit.edu>
Date: Mon, 7 Jun 2004 11:27:47 -0400 
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C44CA3.FC6BF410"

This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C44CA3.FC6BF410
Content-Type: text/plain

> To: 	bengel@mit.edu; dreid@mit.edu; E-Zone; jmganno@mit.edu;
> sdalton@mit.edu; wardd@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu; Jim Hunt; sstordy@mit.edu
> Subject: 	Bldg. E17 - Emergency Power Shutdown Request
> 
> 
The following emergency power shutdown request for Bldg. E17 on Wednesday,
June 9, 2004 is for your information and comment.  Would you please let me
know whether this does or does not meet with your approval.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: E17
> Date: 6/9/2004
> Day: Wednesday
> Time: 7 AM - 9 AM
> System: Emergency Power
> Duration: 2 hours
> Reason: 
> Power in penthouse must be shifted from normal panel to emergency panel.
> Electrical power for freezers on 1st and 2nd floor will be shifted from
> normal power to emergency power.
> 
> Effect: 
> Loss of emergency power in E17. Any equipment that is on emergency power
> will be affected by this shutdown. Normal power will remain on during the
> 2-hour shutdown period.
> 
> 

------_=_NextPart_001_01C44CA3.FC6BF410
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. E17 - Emergency Power Shutdown Request</TITLE>
</HEAD>
<BODY>

<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">bengel@mit.edu; dreid@mit.edu; E-Zone; =
jmganno@mit.edu; sdalton@mit.edu; wardd@mit.edu; =
shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu; Jim Hunt; =
sstordy@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. E17 - Emergency =
Power Shutdown Request</FONT>
</P>
<BR>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following emergency power =
shutdown request for Bldg. E17 on Wednesday, June 9, 2004 is for your =
information and comment.&nbsp; Would you please let me know whether =
this does or does not meet with your approval.</FONT></P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">E17</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">6/9/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Wednesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 9 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Emergency Power</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">2 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Power in penthouse must be =
shifted from normal panel to emergency panel. Electrical power for =
freezers on 1st and 2nd floor will be shifted from normal power to =
emergency power.</FONT></P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of emergency power in =
E17. Any equipment that is on emergency power will be affected by this =
shutdown. Normal power will remain on during the 2-hour shutdown =
period.</FONT></P>
<BR>