[76900] in Hotline Meeting
Bldg. 18 - Rescheduled Critical Hot/Cold Domestic/Lab Process Wat
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed May 12 11:41:36 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D72632@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.EDU>, "'chemistryhq@mit.edu'" <chemistryhq@MIT.EDU>,
Cust-Coach <cust-coach@MIT.EDU>,
"'jdoughty@mit.edu'" <jdoughty@MIT.EDU>,
"'rjwilk@mit.edu'" <rjwilk@MIT.EDU>, "'swade@mit.edu'" <swade@MIT.EDU>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Wed, 12 May 2004 11:39:50 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C43837.5D034A70"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C43837.5D034A70
Content-Type: text/plain
> To: A-Zone; chemistryhq@mit.edu; Cust-Coach; jdoughty@mit.edu;
> rjwilk@mit.edu; swade@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 18 - Rescheduled Critical Hot/Cold Domestic/Lab
> Process Water Shutdown Request
>
>
Dear Everyone:
This shutdown did not occur today because of another shutdown taking place
in Bldg. 18. It has been requested this work now take place on Friday, April
14 as follows.
The following Critical hot/cold domestic/lab process water shutdown request
for Bldg. 18 (entire building) now on Friday, May 14, 2004 is again for your
information and comment. Would you please let me know whether this does or
does not meet with your approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Critical
> Building: 18 - entire building
> Date: 5/14/2004
> Day: Friday
> Time: 7:30 AM - 8 AM
> System: Hot/Cold Domestic/Lab Process Water
> Duration: 1/2 hour
> Reason:
> Test City Supply Cold Water valves for cross connections.
>
> Effect:
> Loss of hot/cold domestic water. This means that no toilets, bathroom,
> kitchen sink faucets or drinking fountains will be operational during the
> 30 minute shutdown period. Loss of hot/cold lab process water. This
> means that no lab sink faucets or equipment requiring same will be
> operational during the 30 minute shutdown period.
>
>
------_=_NextPart_001_01C43837.5D034A70
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 18 - Rescheduled Critical Hot/Cold Domestic/Lab Process =
Water Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">A-Zone; chemistryhq@mit.edu; =
Cust-Coach; jdoughty@mit.edu; rjwilk@mit.edu; swade@mit.edu; =
shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 18 - =
Rescheduled Critical Hot/Cold Domestic/Lab Process Water Shutdown =
Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Dear Everyone:</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">This shutdown did not occur =
today because of another shutdown taking place in Bldg. 18. It has been =
requested this work now take place on Friday, April 14 as =
follows.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following Critical =
hot/cold domestic/lab process water shutdown request for Bldg. 18 =
(entire building) now on Friday, May 14, 2004 is again for your =
information and comment. Would you please let me know whether =
this does or does not meet with your approval. </FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<BR>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Critical</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">18 - entire building</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">5/14/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Friday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7:30 AM - 8 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Hot/Cold Domestic/Lab Process =
Water</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">1/2 hour</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Test City Supply Cold Water =
valves for cross connections.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of hot/cold domestic =
water. This means that no toilets, bathroom, kitchen sink faucets or =
drinking fountains will be operational during the 30 minute shutdown =
period. Loss of hot/cold lab process water. This means that =
no lab sink faucets or equipment requiring same will be operational =
during the 30 minute shutdown period.</FONT></P>