[74894] in Hotline Meeting
Bldg. 26 - Critical All Steam Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Apr 6 14:23:56 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D72468@plantnt.facilities.ms.mit.edu>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'amcgurl@rle.mit.edu'" <amcgurl@rle.mit.edu>, B-Zone <B-Zone@MIT.Edu>,
Cust-Coach <cust-coach@MIT.Edu>, "'dudley@mit.edu'" <dudley@MIT.Edu>,
"'khewitt@mit.edu'" <khewitt@MIT.Edu>,
"'ljtrudel@mit.edu'"
<ljtrudel@MIT.Edu>,
"'lsc@mit.edu'" <lsc@MIT.Edu>, "'mhankin@mit.edu'"
<mhankin@MIT.Edu>,
"'nsteele@mit.edu'" <nsteele@MIT.Edu>,
"'safety@mit.edu'" <safety@MIT.Edu>,
"'schedule@mit.edu'"
<schedule@MIT.Edu>,
"'wrgibbs@rle.mit.edu'" <wrgibbs@rle.mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Tue, 6 Apr 2004 14:22:48 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C41C04.29D5F070"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C41C04.29D5F070
Content-Type: text/plain
> To: amcgurl@rle.mit.edu; B-Zone; Cust-Coach; dudley@mit.edu;
> khewitt@mit.edu; ljtrudel@mit.edu; lsc@mit.edu; mhankin@mit.edu;
> nsteele@mit.edu; safety@mit.edu; schedule@mit.edu; wrgibbs@rle.mit.edu;
> shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 26 - Critical All Steam Shutdown Request
>
>
The following Critical all steam shutdown request for Bldg. 26 on Thursday,
4/8/04 is for your information and comment. Would you please let me know
whether this does or does not meet with your approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7827
> Status: Critical
> Building: 26
> Date: 4/8/2004
> Day: Thursday
> Time: 8 AM - 1 PM
> System: All Steam
> Duration: 5 hours
> Reason:
> One leak on steam line; one leak on steam station.
>
> Effect:
> Loss of high, medium and low pressure steam in Bldg. 26. This means that
> no hot domestic water (for bathroom and kitchen sink faucets), heating hot
> water (building steam heat) or supply heating (via ceiling supply fans)
> will be operational during the shutdown period.
>
>
------_=_NextPart_001_01C41C04.29D5F070
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 26 - Critical All Steam Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">amcgurl@rle.mit.edu; B-Zone; =
Cust-Coach; dudley@mit.edu; khewitt@mit.edu; ljtrudel@mit.edu; =
lsc@mit.edu; mhankin@mit.edu; nsteele@mit.edu; safety@mit.edu; =
schedule@mit.edu; wrgibbs@rle.mit.edu; shutdowns@mit.edu</FONT></P>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 26 - Critical =
All Steam Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following Critical all =
steam shutdown request for Bldg. 26 on Thursday, 4/8/04 is for your =
information and comment. Would you please let me know whether =
this does or does not meet with your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7827</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Critical</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">26</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">4/8/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Thursday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">8 AM - 1 PM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">All Steam</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">5 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">One leak on steam line; one =
leak on steam station.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of high, medium and low =
pressure steam in Bldg. 26. This means that no hot domestic water (for =
bathroom and kitchen sink faucets), heating hot water (building steam =
heat) or supply heating (via ceiling supply fans) will be operational =
during the shutdown period.</FONT></P>