Bldg. 36 - Air Handlers 6, 7 and 8 Control System Upgrade Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Mar 23 09:33:58 2004

Message-ID: <568F0AEE7A57D511923900508B55645103D7235A@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'amcgurl@rle.mit.edu'" <amcgurl@rle.mit.edu>, B-Zone <B-Zone@MIT.Edu>,
        Cust-Coach <cust-coach@MIT.Edu>, Robert Cunkelman <rpc@PLANT.MIT.EDU>,
        "'schedule@mit.edu'" <schedule@MIT.Edu>,
        "'wrgibbs@rle.mit.edu'"
	 <wrgibbs@rle.mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Tue, 23 Mar 2004 09:33:42 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C410E3.D7042450"

This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C410E3.D7042450
Content-Type: text/plain

> To: 	amcgurl@rle.mit.edu; B-Zone; Cust-Coach; Robert Cunkelman;
> schedule@mit.edu; wrgibbs@rle.mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 36 - Air Handlers 6, 7 and 8 Control System Upgrade
> Request
> 
> 
The following Air Handlers 6, 7 and 8  control system upgrade request for
Bldg. 36 -  basement, 2nd through 8th floors North and 2nd through 8th
floors South on Thursday, 3/25/04 is for your information and comment.
Would you please let me know whether this does or does not meet with your
approval.

Thanks very much.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 36 - Basement, 2nd through 8th floors North and South
> Date: 3/25/2004
> Day: Thursday
> Time: 7 AM - 11 AM
> System: Air Handlers 6, 7 and 8
> Duration: 4 hours
> Reason: 
> Control Systems Upgrade.
> 
> Effect: 
> Loss of supply ventilation, supply cooling and supply heating in the
> above-listed areas for approximately 30 minutes only during the 4-hour
> shutdown period.
> 
> 

------_=_NextPart_001_01C410E3.D7042450
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 36 - Air Handlers 6, 7 and 8 Control System Upgrade =
Request</TITLE>
</HEAD>
<BODY>

<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">amcgurl@rle.mit.edu; B-Zone; =
Cust-Coach; Robert Cunkelman; schedule@mit.edu; wrgibbs@rle.mit.edu; =
shutdowns@mit.edu</FONT></P>

<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 36 - Air =
Handlers 6, 7 and 8 Control System Upgrade Request</FONT>
</P>
<BR>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following Air Handlers 6, =
7 and 8&nbsp; control system upgrade request for Bldg. 36 -&nbsp; =
basement, 2nd through 8th floors North and 2nd through 8th floors South =
on Thursday, 3/25/04 is for your information and comment.&nbsp; Would =
you please let me know whether this does or does not meet with your =
approval.</FONT></P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">36 - Basement, 2nd through 8th floors =
North and South</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">3/25/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Thursday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 11 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Air Handlers 6, 7 and 8</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Control Systems =
Upgrade.</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of supply ventilation, =
supply cooling and supply heating in the above-listed areas for =
approximately 30 minutes only during the 4-hour shutdown =