Bldg. 44 - All Normal Power Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Mar 22 10:04:29 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D72340@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: D-Zone <D-Zone@MIT.Edu>, "'fisherp@mit.edu'" <fisherp@MIT.Edu>,
"'khewitt@mit.edu'" <khewitt@MIT.Edu>,
"'bales@mit.edu'" <bales@MIT.Edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>,
Cust-Coach
<cust-coach@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Mon, 22 Mar 2004 10:03:54 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C4101E.E4A972B0"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C4101E.E4A972B0
Content-Type: text/plain
> To: D-Zone; fisherp@mit.edu; khewitt@mit.edu; bales@mit.edu;
> shutdowns@mit.edu; Cust-Coach
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 44 - All Normal Power Shutdown Request
>
>
The following all normal power shutdown request for Bldg. 44 on Thursday,
3/25 PM to Friday, 3/26 AM is for your information and comment. Would you
please let me know whether this does or does not meet with your approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: 44
> Date: 3/25/2004
> Day: Thursday
> Time: 11 PM (3/25) - 3 AM (3/26)
> System: All Normal Power
> Duration: 4 hours
> Reason:
> Repair damaged high-voltage ductbank.
>
> Effect:
> Loss of All Normal Power: Access Controls (outlets in all offices and
> labs), building power, computers, lighting in corridors/stairs. Air:
> Loss of supply ventilation (outside air), supply cooling, supply heating
> (all from ceiling supply fans), exhaust-laboratory, exhaust-general,
> exhaust-toilet, compressed control, compressed lab air and lab vacuum air.
> Steam: High, medium, low pressure steam as well as condensate return. This
> means there will be no hot domestic water (for bathroom, kitchen sink
> faucets), heating hot water (building steam heat) or supply heating (via
> ceiling supply fans) in Bdg. 44 during the 4-hour early morning shutdown
> period.
>
>
------_=_NextPart_001_01C4101E.E4A972B0
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 44 - All Normal Power Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">D-Zone; fisherp@mit.edu; =
khewitt@mit.edu; bales@mit.edu; shutdowns@mit.edu; Cust-Coach</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 44 - All Normal =
Power Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following all normal power =
shutdown request for Bldg. 44 on Thursday, 3/25 PM to Friday, 3/26 AM =
is for your information and comment. Would you please let me know =
whether this does or does not meet with your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">44</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">3/25/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Thursday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">11 PM (3/25) - 3 AM (3/26)</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">All Normal Power</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair damaged high-voltage =
ductbank.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of All Normal =
Power: Access Controls (outlets in all offices and labs), =
building power, computers, lighting in corridors/stairs. =
Air: Loss of supply ventilation (outside air), supply cooling, =
supply heating (all from ceiling supply fans), exhaust-laboratory, =
exhaust-general, exhaust-toilet, compressed control, compressed lab air =
and lab vacuum air. Steam: High, medium, low pressure steam as =
well as condensate return. This means there will be no hot domestic =
water (for bathroom, kitchen sink faucets), heating hot water (building =
steam heat) or supply heating (via ceiling supply fans) in Bdg. 44 =
during the 4-hour early morning shutdown period.</FONT></P>