[72716] in Hotline Meeting
Bldg. NW21 - Low Pressure Steam Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Feb 23 09:02:26 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D7219E@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: D-Zone <D-Zone@MIT.Edu>, "'fulton@psfc.mit.edu'" <fulton@psfc.mit.edu>,
"'hrycaj@psfc.mit.edu'" <hrycaj@psfc.mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Mon, 23 Feb 2004 09:02:06 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C3FA15.9EF5EC40"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C3FA15.9EF5EC40
Content-Type: text/plain
> To: D-Zone; fulton@psfc.mit.edu; hrycaj@psfc.mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. NW21 - Low Pressure Steam Shutdown Request
>
>
The following low pressure steam shutdown request for Bldg. NW21 - 1st floor
on Wednesday, 2/25/05 is for your information and comment. Would you please
let me know whether this does or does or not meet with your approval.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: NW21 - 1st floor
> Date: 2/25/2004
> Day: Wednesday
> Time: 7 AM - 12 Noon
> System: Low Pressure Steam
> Duration: 5 hours
> Reason:
> Relocte boiler on 1st floor for new piping.
>
> Effect:
> Loss of low pressure steam (heating hot water) in NW21 - 1st floor during
> the 5-hour shutdown period.
>
>
------_=_NextPart_001_01C3FA15.9EF5EC40
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. NW21 - Low Pressure Steam Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">D-Zone; fulton@psfc.mit.edu; =
hrycaj@psfc.mit.edu; shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. NW21 - Low =
Pressure Steam Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following low pressure =
steam shutdown request for Bldg. NW21 - 1st floor on Wednesday, 2/25/05 =
is for your information and comment. Would you please let me know =
whether this does or does or not meet with your approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">NW21 - 1st floor</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">2/25/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Wednesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 12 Noon</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Low Pressure Steam</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">5 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Relocte boiler on 1st floor =
for new piping.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of low pressure steam =
(heating hot water) in NW21 - 1st floor during the 5-hour shutdown =
period.</FONT>
</P>
<BR>
</BODY>
</HTML>
------_=_NextPart_001_01C3FA15.9EF5EC40--