[72362] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 38 - Revised Hot/Cold Domestic Water Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Feb 13 14:03:49 2004

Message-ID: <568F0AEE7A57D511923900508B55645103D7215E@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'agallant@mit.edu'" <agallant@mit.edu>,
        "'amcgurl@rle.mit.edu'"
	 <amcgurl@rle.mit.edu>,
        B-Zone <B-Zone@mit.edu>, Cust-Coach
	 <cust-coach@mit.edu>,
        "'edc@mit.edu'" <edc@mit.edu>,
        "'fletch1@eecs.mit.edu'" <fletch1@eecs.mit.edu>,
        "'pmorley@mit.edu'"
	 <pmorley@mit.edu>,
        "'rroscoe@mit.edu'" <rroscoe@mit.edu>,
        "'schedule@mit.edu'" <schedule@mit.edu>,
        "'wrgibbs@rle.mit.edu'"
	 <wrgibbs@rle.mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>
Date: Fri, 13 Feb 2004 14:01:21 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C3F263.C4B7CD90"

This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C3F263.C4B7CD90
Content-Type: text/plain;
	charset="iso-8859-1"

Dear Everyone:

I have found out the revised hot/cold domestic water shutdown request for
Bldg. 38 on Tuesday, from 7:30 - 9:30 AM will only involve floor 1 not the
entire building. Thus this should read Building: 38 - 1st floor only.
Reason: Tie-in new eye wash station in 158Z.

FYI and thank you.

Andrea Nichols
Repair and Maintenance
8-7872


------_=_NextPart_001_01C3F263.C4B7CD90
Content-Type: text/html;
	charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 38 - Revised Hot/Cold Domestic Water Shutdown =
Request</TITLE>
</HEAD>
<BODY>

<P><FONT SIZE=3D2 FACE=3D"Arial">Dear Everyone:</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">I have found out the revised hot/cold =
domestic water shutdown request for Bldg. 38 on Tuesday, from 7:30 - =
9:30 AM will only involve floor 1 not the entire building. Thus this =
should read Building: 38 - 1st floor only. Reason: Tie-in new eye wash =
station in 158Z.</FONT></P>

<P><FONT SIZE=3D2 FACE=3D"Arial">FYI and thank you.</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">8-7872</FONT>
</P>

</BODY>
</HTML>
------_=_NextPart_001_01C3F263.C4B7CD90--

home help back first fref pref prev next nref lref last post