[72072] in Hotline Meeting
Bldg. E56 - Roof Top Units 1, 2, 3 and 4 Shutdown/Control system
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Feb 6 07:24:59 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D720CD@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'aed@mit.edu'" <aed@mit.edu>, "'bedwards@mit.edu'" <bedwards@mit.edu>,
E-Zone <E-Zone@mit.edu>, "'gwj@mit.edu'" <gwj@mit.edu>,
"'lhill@mit.edu'"
<lhill@mit.edu>,
"'mscoppa@mit.edu'" <mscoppa@mit.edu>,
"'schedule@mit.edu'" <schedule@mit.edu>,
"'dempsey@mit.edu'"
<dempsey@mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'alegere@mit.edu'" <alegere@mit.edu>
Date: Fri, 6 Feb 2004 07:24:02 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C3ECAC.1A863940"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C3ECAC.1A863940
Content-Type: text/plain
> To: aed@mit.edu; bedwards@mit.edu; E-Zone; gwj@mit.edu; lhill@mit.edu;
> mscoppa@mit.edu; schedule@mit.edu; dempsey@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu; alegere@mit.edu
> Subject: Bldg. E56 - Roof Top Units 1, 2, 3 and 4 Shutdown/Control
> system Upgrade Request
>
>
The following roof top units 1, 2, 3 and 4 shutdown/control system upgrade
request for Bldg. E56 on Wednesday, 2/11/04 is for your information and
comment. Would you please let me know whether this does or does not meet
with your approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: E56
> Date: 2/11/2004
> Day: Wednesday
> Time: 7 AM - 11 AM
> System: Roof top units 1, 2, 3 and 4 (one hour each), Air Handlers 6 and 7
> will run, converters will run
> Duration: 4 hours
> Reason:
> Control System Upgrade.
> Each unit will be down for 1 hour while the other units remain
> operational.
>
> Effect:
> Loss of supply ventilation, supply cooling and supply heating for one hour
> each per roof top unit as follows: Unit 1 - Second floor South, 1st and
> Ground Floors; Unit 2, 2nd floor North and 3rd floor; Unit 3 - Lecture
> Hall 270; and Unit 4 - Penthouse office. Air Handlers 6 and 7 will remain
> operational. In other words, the Rare book stack 070A and exhibition area
> will not be affected by the Control System Upgrade.
>
>
------_=_NextPart_001_01C3ECAC.1A863940
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. E56 - Roof Top Units 1, 2, 3 and 4 Shutdown/Control system =
Upgrade Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">aed@mit.edu; bedwards@mit.edu; E-Zone; =
gwj@mit.edu; lhill@mit.edu; mscoppa@mit.edu; schedule@mit.edu; =
dempsey@mit.edu; shutdowns@mit.edu</FONT></P>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu; =
alegere@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. E56 - Roof Top =
Units 1, 2, 3 and 4 Shutdown/Control system Upgrade Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following roof top units =
1, 2, 3 and 4 shutdown/control system upgrade request for Bldg. E56 on =
Wednesday, 2/11/04 is for your information and comment. Would you =
please let me know whether this does or does not meet with your =
approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">E56</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">2/11/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Wednesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 11 AM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Roof top units 1, 2, 3 and 4 (one hour =
each), Air Handlers 6 and 7 will run, converters will run</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">4 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Control System =
Upgrade.</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Each unit will be down for 1 =
hour while the other units remain operational.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of supply ventilation, =
supply cooling and supply heating for one hour each per roof top unit =
as follows: Unit 1 - Second floor South, 1st and Ground Floors; Unit 2, =
2nd floor North and 3rd floor; Unit 3 - Lecture Hall 270; and Unit 4 - =
Penthouse office. Air Handlers 6 and 7 will remain operational. In =
other words, the Rare book stack 070A and exhibition area will not be =
affected by the Control System Upgrade.</FONT></P>
<BR>
</BODY>
</HTML>