[71744] in Hotline Meeting
Bldg. 26 - Critical Heating Hot Water Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Jan 28 14:10:41 2004
Message-ID: <568F0AEE7A57D511923900508B55645103D72034@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'amcgurl@rle.mit.edu'" <amcgurl@rle.mit.edu>, B-Zone <B-Zone@MIT.Edu>,
Cust-Coach <cust-coach@MIT.Edu>, "'dudley@mit.edu'" <dudley@MIT.Edu>,
"'khewitt@mit.edu'" <khewitt@MIT.Edu>,
"'ljtrudel@mit.edu'"
<ljtrudel@MIT.Edu>,
"'lsc@mit.edu'" <lsc@MIT.Edu>, "'mhankin@mit.edu'"
<mhankin@MIT.Edu>,
"'nsteele@mit.edu'" <nsteele@MIT.Edu>,
"'safety@mit.edu'" <safety@MIT.Edu>,
"'schedule@mit.edu'"
<schedule@MIT.Edu>,
"'wrgibbs@rle.mit.edu'" <wrgibbs@rle.mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Wed, 28 Jan 2004 14:10:25 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C3E5D2.62555C00"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C3E5D2.62555C00
Content-Type: text/plain
> To: amcgurl@rle.mit.edu; B-Zone; Cust-Coach; dudley@mit.edu;
> khewitt@mit.edu; ljtrudel@mit.edu; lsc@mit.edu; mhankin@mit.edu;
> nsteele@mit.edu; safety@mit.edu; schedule@mit.edu; wrgibbs@rle.mit.edu;
> shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 26 - Critical Heating Hot Water Shutdown Request
>
>
The following Critical heating hot water shutdown request for Bldg. 26 - all
perimeter areas on Saturday, 1/31/04 is for your information and comment.
Would you please let me know whether this does or does not meet with your
approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Critical
> Building: 26 - all perimeter areas
> Date: 1/31/2004
> Day: Saturday
> Time: 7 AM - 3 PM
> System: Heating Hot Water
> Duration: 8 hours
> Reason:
> Relocate hot water pipe, interference w/installation of fire door.
> Critical to STATA occupancy.
>
> Effect:
> Loss of building heating hot water during the shutdown period.
>
>
------_=_NextPart_001_01C3E5D2.62555C00
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 26 - Critical Heating Hot Water Shutdown Request</TITLE>
</HEAD>
<BODY>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">amcgurl@rle.mit.edu; B-Zone; =
Cust-Coach; dudley@mit.edu; khewitt@mit.edu; ljtrudel@mit.edu; =
lsc@mit.edu; mhankin@mit.edu; nsteele@mit.edu; safety@mit.edu; =
schedule@mit.edu; wrgibbs@rle.mit.edu; shutdowns@mit.edu</FONT></P>
<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 26 - Critical =
Heating Hot Water Shutdown Request</FONT>
</P>
<BR>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following Critical heating =
hot water shutdown request for Bldg. 26 - all perimeter areas on =
Saturday, 1/31/04 is for your information and comment. Would you =
please let me know whether this does or does not meet with your =
approval.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thanks very much.</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Critical</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">26 - all perimeter areas</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">1/31/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Saturday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">7 AM - 3 PM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Heating Hot Water</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">8 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Relocate hot water pipe, =
interference w/installation of fire door. Critical to STATA =
occupancy.</FONT>
</P>
<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Loss of building heating hot =
water during the shutdown period.</FONT>
</P>