[71730] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 48 - Normal Power Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Jan 28 10:18:07 2004

Message-ID: <568F0AEE7A57D511923900508B55645103D72020@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
        "'mistetri@mit.edu'" <mistetri@MIT.Edu>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        Billy Homeyer
	 <whomeyer@PLANT.MIT.EDU>,
        "'sfrankel@mit.edu'" <sfrankel@MIT.Edu>
Date: Wed, 28 Jan 2004 10:17:20 -0500
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C3E5B1.D2CD0710"

This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C3E5B1.D2CD0710
Content-Type: text/plain

> To: 	B-Zone; Cust-Coach; mistetri@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu; Billy Homeyer; sfrankel@mit.edu
> Subject: 	Bldg. 48 - Normal Power Shutdown Request
> 
> 
The following Normal power shutdown request for Bldg. 48 - Basement on
Tuesday, 2/3/04 is for your information and comment.  Would you please let
me know whether this does or does not meet with your approval.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 48 - Basement
> Date: 2/3/2004
> Day: Tuesday
> Time: 3 PM - 6 PM
> System: Normal Power
> Duration: 3 hours
> Reason: 
> To inspect transformer, conduct ground test and also change-out 3 breakers
> at new switch gear that failed test.
> 
> Effect: 
> Power: Loss of normal power in Bldg. 48 - basement. This means there will
> be temporary lighting but no receptacles in the basment. Loss of building
> power, computers, Water: chilled water, condenser water, pure water, hot
> domestic, hot lab process, heating hot water, cold domestic, cold lab
> process and de-ionized water; Air:  loss of supply ventilation, supply
> cooling, supply heating, exhaust-laboratory, exhaust-general,
> exhaust-toilet, compressed control and compressed lab air in 48 - Basement
> only.  There will be emergency power in Bldg. 48 - 1st and 2nd floors
> during the 3-hour shutdown period. This means that all of the above
> services not available in the basement will be available on floors 1 and
> 2.
> 
> 

------_=_NextPart_001_01C3E5B1.D2CD0710
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3DUS-ASCII">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Bldg. 48 - Normal Power Shutdown Request</TITLE>
</HEAD>
<BODY>

<P><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">To:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">B-Zone; Cust-Coach; mistetri@mit.edu; =
shutdowns@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Cc:</FONT></B> &nbsp;&nbsp;&nbsp; <FONT COLOR=3D"#080000" =
SIZE=3D2 FACE=3D"MS Sans Serif">shutdown@plant.mit.edu; Billy Homeyer; =
sfrankel@mit.edu</FONT>
<BR><B><FONT COLOR=3D"#120000" SIZE=3D2 FACE=3D"MS Sans =
Serif">Subject:</FONT></B> &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <FONT =
COLOR=3D"#080000" SIZE=3D2 FACE=3D"MS Sans Serif">Bldg. 48 - Normal =
Power Shutdown Request</FONT>
</P>
<BR>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">The following Normal power =
shutdown request for Bldg. 48 - Basement on Tuesday, 2/3/04 is for your =
information and comment.&nbsp; Would you please let me know whether =
this does or does not meet with your approval.</FONT></P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Thank you.</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Andrea Nichols</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Repair and Maintenance</FONT>
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">8-7872</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Status:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Building:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">48 - Basement</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Date:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">2/3/2004</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Day:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Tuesday</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Time:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">3 PM - 6 PM</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">System:</FONT></B> <FONT =
SIZE=3D2 FACE=3D"MS Sans Serif">Normal Power</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Duration:</FONT></B> <FONT =
FACE=3D"MS Sans Serif">3 hours</FONT>
<BR><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Reason:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">To inspect transformer, =
conduct ground test and also change-out 3 breakers at new switch gear =
that failed test.</FONT>
</P>

<P><B><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Effect:</FONT></B>=20
<BR><FONT SIZE=3D2 FACE=3D"MS Sans Serif">Power: Loss of normal power =
in Bldg. 48 - basement. This means there will be temporary lighting but =
no receptacles in the basment. Loss of building power, computers, =
Water: chilled water, condenser water, pure water, hot domestic, hot =
lab process, heating hot water, cold domestic, cold lab process and =
de-ionized water; Air:&nbsp; loss of supply ventilation, supply =
cooling, supply heating, exhaust-laboratory, exhaust-general, =
exhaust-toilet, compressed control and compressed lab air in 48 - =
Basement only.&nbsp; There will be emergency power in Bldg. 48 - 1st =
and 2nd floors during the 3-hour shutdown period. This means that all =
of the above services not available in the basement will be available =
on floors 1 and 2.</FONT></P>
<BR>

</BODY>
</HTML>
------_=_NextPart_001_01C3E5B1.D2CD0710--

home help back first fref pref prev next nref lref last post