[70311] in Hotline Meeting
Bldg. 10 - Emergency Heating Hot Water Shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Dec 5 13:17:19 2003
Message-ID: <568F0AEE7A57D511923900508B55645103D71E12@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: C-Zone <C-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
"'dfucillo@mit.edu'" <dfucillo@MIT.Edu>,
"'dhelman@mit.edu'"
<dhelman@MIT.Edu>,
"'emmarogers@mit.edu'" <emmarogers@MIT.Edu>,
"'esdeb@mit.edu'" <esdeb@MIT.Edu>,
"'granvill@mit.edu'"
<granvill@MIT.Edu>,
"'graposa@MIT.EDU'" <graposa@MIT.Edu>,
"'jchume@mit.edu'" <jchume@MIT.Edu>,
"'jhlyons@mit.edu'"
<jhlyons@MIT.Edu>,
"'jobrien@mit.edu'" <jobrien@MIT.Edu>,
"'jsoroko@mit.edu'" <jsoroko@MIT.Edu>,
"'kates@mit.edu'" <kates@MIT.Edu>, "'lsc@mit.edu'" <lsc@MIT.Edu>,
"'mdhinkle@mit.edu'" <mdhinkle@MIT.Edu>,
"'mleen@mit.edu'" <mleen@MIT.Edu>, "'ndk@mit.edu'" <ndk@MIT.Edu>,
"'rrhonda@mit.edu'" <rrhonda@MIT.Edu>, "'ryan@mit.edu'" <ryan@MIT.Edu>,
"'schedule@mit.edu'" <schedule@MIT.Edu>,
"'sdl-adm-lib@mit.edu'"
<sdl-adm-lib@MIT.Edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>,
"'dcosta@mit.edu'" <dcosta@MIT.Edu>,
Ronald Beaulieu <bobo@PLANT.MIT.EDU>,
"'johnnyd@mit.edu'" <johnnyd@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@MIT.Edu>,
Operators
<Operators@PLANT.MIT.EDU>
Date: Fri, 5 Dec 2003 13:12:01 -0500
> To: C-Zone; Cust-Coach; dfucillo@mit.edu; dhelman@mit.edu;
> emmarogers@mit.edu; esdeb@mit.edu; granvill@mit.edu; graposa@MIT.EDU;
> jchume@mit.edu; jhlyons@mit.edu; jobrien@mit.edu; jsoroko@mit.edu;
> kates@mit.edu; lsc@mit.edu; mdhinkle@mit.edu; mleen@mit.edu; ndk@mit.edu;
> rrhonda@mit.edu; ryan@mit.edu; schedule@mit.edu; sdl-adm-lib@mit.edu;
> shutdowns@mit.edu; dcosta@mit.edu; Ronald Beaulieu; johnnyd@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators
> Subject: Bldg. 10 - Emergency Heating Hot Water Shutdown
>
>
The following emergency heating hot water (building heat) shutdown for Bldg.
10 - 4th floor (Perimeter Area only) on Saturday, December 6, 2003 is for
your information.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Emergency
> Building: 10 - 4th floor - Perimeter Area only
> Date: 12/6/2003
> Day: Saturday
> Time: 7 AM - 3 PM
> System: Heating Hot Water
> Duration: 8 hours
> Reason:
> Bad bearing assembly.
>
> Effect:
> Loss of heating hot water (building heat) in perimeter area only in the
> above-listed area during the 8 hour emergency shutdown period.
>
>