Bldg. 13 - Hot/Cold Domestic and Lab Process Water Shutdown Reque

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Dec 5 10:08:24 2003

Message-ID: <568F0AEE7A57D511923900508B55645103D71E0A@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
        "'elk@mit.edu'" <elk@MIT.Edu>, "'generoso@mit.edu'" <generoso@MIT.Edu>,
        "'schedule@mit.edu'" <schedule@MIT.Edu>, "'src@mit.edu'" <src@MIT.Edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 5 Dec 2003 10:08:08 -0500 

> To: 	B-Zone; Cust-Coach; elk@mit.edu; generoso@mit.edu; schedule@mit.edu;
> src@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 13 - Hot/Cold Domestic and Lab Process Water Shutdown
> Request
> 
> 
The following hot/cold domestic and lab process water shutdown for Bldg. 13
- All on Saturday, December 13, 2003 is for your informatio and comment.
Would you please let me know whether this does or does not meet with your
approval.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 13
> Date: 12/13/2003
> Day: Saturday
> Time: 6 AM - 3 PM
> System: Hot/Cold Domestic and Lab Process Water
> Duration: 9 hours
> Reason: 
> Relocate domestic water booster pump to make way for new acid waste
> system.
> 
> Effect: 
> Loss of hot/cold domestic water. This means that no toilets, bathroom,
> kitchen sink faucets or drinking fountains will be operational during the
> 9-hour shutdown period.  No hot/cold lab process water. This means that no
> lab sink faucets or certain equipment requiring lab process water will be
> operational during the 9-hour shutdown period.
> 
> 