[66436] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldgs. 18 and 6 Hot/Cold Domestic and Lab Process Water and Lab W

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jun 13 11:09:41 2003

Message-ID: <568F0AEE7A57D511923900508B556451023F20A6@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.Edu>, "'chemistryhq@mit.edu'" <chemistryhq@MIT.Edu>,
        Cust-Coach <cust-coach@MIT.Edu>, "'lhowe@mit.edu'" <lhowe@MIT.Edu>,
        "'rjwilk@mit.edu'" <rjwilk@MIT.Edu>,
        "'serotek@mit.edu'"
	 <serotek@MIT.Edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.Edu>, C-Zone
	 <C-Zone@MIT.Edu>,
        "'ghughes@mit.edu'" <ghughes@MIT.Edu>,
        "'glabonte@mit.edu'" <glabonte@MIT.Edu>,
        "'khewitt@mit.edu'"
	 <khewitt@MIT.Edu>,
        "'mhankin@mit.edu'" <mhankin@MIT.Edu>,
        "'rhasselt@MIT.EDU'" <rhasselt@MIT.Edu>,
        "'rrdasari@mit.edu'"
	 <rrdasari@MIT.Edu>,
        "'saraf@mit.edu'" <saraf@MIT.Edu>,
        "'heatherg@mit.edu'" <heatherg@MIT.Edu>,
        "'vrusso@mit.edu'"
	 <vrusso@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 13 Jun 2003 11:09:29 -0400

> To: 	A-Zone; chemistryhq@mit.edu; Cust-Coach; lhowe@mit.edu;
> rjwilk@mit.edu; serotek@mit.edu; shutdowns@mit.edu; C-Zone;
> ghughes@mit.edu; glabonte@mit.edu; khewitt@mit.edu; mhankin@mit.edu;
> rhasselt@MIT.EDU; rrdasari@mit.edu; saraf@mit.edu; heatherg@mit.edu;
> vrusso@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldgs. 18 and 6 Hot/Cold Domestic and Lab Process Water and
> Lab Waste Shutdown Request
> 
> 
The following hot/cold domestic and lab process water and lab waste shutdown
request for Bldgs. 18 - Phase I Labs and all of Building 6 on Wednesday,
June 18 is for your information and comment.  Would you please let me know
whether this does or does not meet with your approval.

Thanks very much.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 18 - Phase I Labs and Building 6 - All
> Date: 6/18/2003
> Day: Wednesday
> Time: 6 AM - 10 AM
> System: Acid Waste, Hot/Cold Domestic Water/Hot/Cold Lab Process Water
> Duration: 4 hours
> Reason: 
> Tie-in building 18 acid waste drains to new sump in subbasement.
> 
> Effect: 
> Loss of hot/cold domstic water in Bldg. 18 - Phase 1 Labs and all of Bldg.
> 6. This means that no toilets, emergency showers, bathroom, kitchen, lab
> sink faucets or drinking fountains will be operational during the shutdown
> period.  Loss of hot/cold lab process water in the above-listed areas.
> This means that no lab equipment or lab sinks requiring same will be
> operational during the shutdown period. Loss of lab waste drainage in the
> above-listed areas during the shutdown period.
> 
> 

home help back first fref pref prev next nref lref last post