[62078] in Hotline Meeting
Bldg. E19 - Emergency Heating Hot Water Shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Oct 28 07:50:55 2002
Message-ID: <568F0AEE7A57D511923900508B556451012328BC@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: Robert Carr <rcarr@PLANT.MIT.EDU>, "'bengel@mit.edu'" <bengel@mit.edu>,
"'cschultz@mit.edu'" <cschultz@mit.edu>,
"'dcairns@mit.edu'"
<dcairns@mit.edu>,
"'dlking@mit.edu'" <dlking@mit.edu>, "'dreid@mit.edu'" <dreid@mit.edu>,
"'dshea@mit.edu'" <dshea@mit.edu>, "'dturn@mit.edu'" <dturn@mit.edu>,
E-Zone <E-Zone@mit.edu>, "'e19site@mit.edu'" <e19site@mit.edu>,
"'elsagt@mit.edu'"
<elsagt@mit.edu>,
"'esico@mit.edu'" <esico@mit.edu>,
"'hallisey@mit.edu'" <hallisey@mit.edu>,
"'honiker@mit.edu'"
<honiker@mit.edu>, "'ilf@mit.edu'" <ilf@mit.edu>,
"'joconor@mit.edu'"
<joconor@mit.edu>,
"'kelley@mit.edu'" <kelley@mit.edu>,
"'kshooter@mit.edu'" <kshooter@mit.edu>,
"'lambert@mitvma.mit.edu'"
<lambert@mitvma.mit.edu>,
"'mbowers@mit.edu'" <mbowers@mit.edu>,
Michael Sherman <MSherman@PLANT.MIT.EDU>,
Mary Tobin
<mtobin@PLANT.MIT.EDU>,
"'narbonne@MIT.EDU'" <narbonne@mit.edu>,
"'opsnote@mit.edu'" <opsnote@mit.edu>,
"'rberlin@mit.edu'"
<rberlin@mit.edu>,
"'sfalconi@mit.edu'" <sfalconi@mit.edu>,
"'tdalton@mit.edu'" <tdalton@mit.edu>,
"'tquinn@mit.edu'"
<tquinn@mit.edu>,
"'wbarrett@mit.edu'" <wbarrett@mit.edu>,
"'wganger@mit.edu'" <wganger@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'dcosta@mit.edu'" <dcosta@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
Operators
<Operators@PLANT.MIT.EDU>
Date: Mon, 28 Oct 2002 07:50:49 -0500
MIME-Version: 1.0
Content-Type: text/plain
> To: Robert Carr; bengel@mit.edu; cschultz@mit.edu; dcairns@mit.edu;
> dlking@mit.edu; dreid@mit.edu; dshea@mit.edu; dturn@mit.edu; E-Zone;
> e19site@mit.edu; elsagt@mit.edu; esico@mit.edu; hallisey@mit.edu;
> honiker@mit.edu; ilf@mit.edu; joconor@mit.edu; kelley@mit.edu;
> kshooter@mit.edu; lambert@mitvma.mit.edu; mbowers@mit.edu; Michael
> Sherman; Mary Tobin; narbonne@MIT.EDU; opsnote@mit.edu; rberlin@mit.edu;
> sfalconi@mit.edu; tdalton@mit.edu; tquinn@mit.edu; wbarrett@mit.edu;
> wganger@mit.edu; shutdowns@mit.edu; dcosta@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators
> Subject: Bldg. E19 - Emergency Heating Hot Water Shutdown
>
>
The following emergency heating hot water shutdown for Bldg. E19 on Monday,
10/28 is for your information. If you have any questions about this, please
contact Bob Car at x3-1500.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Emergency
> Building: E19
> Date: 10/28/2002
> Day: Monday
> Time: 8 AM - 4 PM
> System: Heating Hot Water
> Duration: 8 hours
> Reason:
> Bad leak in E19/E18 Corridor.
>
> Effect:
> Loss of building heating hot water during the emergency shutdown period.
>
>