RE: Bldg E23 Critical shutdown request for 9/6/02 RESCHEDULED

daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Fri Aug 30 08:21:09 2002

Message-ID: <568F0AEE7A57D511923900508B55645101B16C7D@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: E-Zone <E-Zone@MIT.Edu>, bengel@MIT.Edu, brig@med.mit.edu,
        dwye@med.mit.edu, fris@med.mit.edu, tquinn@MIT.Edu, schedule@MIT.Edu,
        shutdowns@MIT.Edu
Cc: shutdown@PLANT.MIT.EDU
Date: Fri, 30 Aug 2002 08:20:58 -0400
MIME-Version: 1.0
Content-Type: text/plain

We would like to try and reschedule this critical shutdown for building E23
from 9/2 to 9/6.  Please let me know if this does or does not meet with your
approval.

Thank you
Dawn Simonelli
Repair and Maintenance


> Status: Critical
> Building: E23
> Date: 9/6/2002
> Day: Friday
> Time: 7pm - 7am
> System: Domestic hot and Cold and all drain piping.
> Duration: 12 hours
> Reason:  To cut and cap water lines and change out some drainage in the
basement.
> 
> Effect:  There will be no hot or cold domestic water available during this
time.
> Also no hot or cold lab processed water during this time.
> 
> 