[60815] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 33 - Emergency Air handler 2 Shutdown

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Aug 15 09:20:25 2002

Message-ID: <568F0AEE7A57D511923900508B556451012324B1@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'edorsch@mit.edu'" <edorsch@mit.edu>,
        "'gallant@mit.edu'"
	 <gallant@mit.edu>,
        "'graposa@mit.edu'" <graposa@mit.edu>, "'src@mit.edu'" <src@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>,
        "'schedule@mit.edu'" <schedule@mit.edu>,
        "'dcosta@mit.edu'"
	 <dcosta@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
        Operators
	 <Operators@PLANT.MIT.EDU>,
        Scott Brenner <sbrenner@PLANT.MIT.EDU>,
        "'johnnyd@mit.edu'" <johnnyd@mit.edu>
Date: Thu, 15 Aug 2002 09:20:19 -0400
MIME-Version: 1.0
Content-Type: text/plain

> To: 	edorsch@mit.edu; gallant@mit.edu; graposa@mit.edu; src@mit.edu;
> shutdowns@mit.edu; schedule@mit.edu; dcosta@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators; Scott
> Brenner; johnnyd@mit.edu
> Subject: 	Bldg. 33 - Emergency Air handler 2 Shutdown
> 
> 
The following Emergency Air Handler 2 shutdown for Bldg. 33 - floors 2 thru
4 facing Bldg. 31 side on Thursday, 8/15 is for your information.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Emergency
> Building: 33 - floors 2 thru 4 facing Bldg. 31 side
> Date: 8/15/2002
> Day: Thursday
> Time: 8:45 AM  - 12:45 PM or sooner
> System: Air Handler 2 - PM#730971
> Duration: 2 - 4 hours
> Reason: 
> Fan broken down.
> 
> Effect: 
> Loss of supply ventilation, supply cooling and supply heating (not on in
> summer) during the emergency shutdown epriod.
> 
> 