Bldgs. NE43 - Critical HVAC Plumbing Electrical Equipment Fire Pu

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed May 29 13:05:07 2002

Message-ID: <568F0AEE7A57D511923900508B55645101231F8A@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'achow@ai.mit.edu'" <achow@ai.mit.edu>, B-Zone <B-Zone@MIT.Edu>,
        Cust-Coach <cust-coach@MIT.Edu>,
        "'natkin@HQ.LCS.MIT.EDU'"
	 <natkin@HQ.LCS.MIT.EDU>,
        "'ladd@lcs.mit.edu'" <ladd@lcs.mit.edu>,
        "'dcosta@mit.edu'" <dcosta@MIT.Edu>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.Edu>,
        "'johnnyd@mit.edu'" <johnnyd@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@MIT.Edu>,
        Operators
	 <Operators@PLANT.MIT.EDU>
Date: Wed, 29 May 2002 13:05:03 -0400
MIME-Version: 1.0
Content-Type: text/plain

> To: 	achow@ai.mit.edu; B-Zone; Cust-Coach; natkin@HQ.LCS.MIT.EDU;
> ladd@lcs.mit.edu; dcosta@mit.edu; shutdowns@mit.edu; johnnyd@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators
> Subject: 	Bldgs. NE43 - Critical HVAC Plumbing Electrical Equipment
> Fire Pumps Shutdown Notification
> 
> 
The following Critical HVAC, Plumbing, Electrical Equipment, Fire Pumps
shutdown notification on Friday, May 31 and Saturday, June 1 is for your
information.  If you have any questions about this, please contact Mary Anne
Ladd at x3-7259.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Critical
> Building: NE43 - Entire Building
> Date: 5/31/2002
> Day: Friday
> Time: 9 PM (5/31) - 2 PM (6/1)
> System: All HVAC, Plumbing, Electrical Equipment, Fire Pumps
> Duration: 14 hours
> Reason: 
> Move the building from temporary to permanent transformers.
> 
> Effect: 
> Loss of Power:  access controls, emergency generator, emergency power,
> building power, elevators, computers, telephones,
> lighting/corridors/stairs;  Water:  chilled water, condenser water, pure
> water, hot domestic, hot lab process, heating hot water, cold domestic,
> cold lab process and de-ionized;  Air:  supply ventilation, supply
> cooling, supply heating, exhaust-laboratory, exhaust-general,
> exhaust-toilet, compressed control compressed lab air;  Steam:  high,
> medium, low pressure and condensate return;  Drainage:  lab waste,
> sanitary, storm drain;  Other:  Fire Alarm, fire protection water, natural
> gas, odors, smoke detectors and exhaust hoods.  
> 
> 