Bldg. E18 and E19 Hot Domestic, Lab Process and Heating Hot Water

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu May 9 12:03:51 2002

Message-ID: <568F0AEE7A57D511923900508B55645101231E6C@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'bengel@mit.edu'" <bengel@mit.edu>, "'dreid@mit.edu'" <dreid@mit.edu>,
        "'dudley@mit.edu'" <dudley@mit.edu>, E-Zone <E-Zone@mit.edu>,
        "'jmganno@mit.edu'" <jmganno@mit.edu>,
        "'lombardo@mit.edu'"
	 <lombardo@mit.edu>,
        "'lstcroix@mit.edu'" <lstcroix@mit.edu>,
        "'nsteele@mit.edu'" <nsteele@mit.edu>,
        "'safety@mit.edu'"
	 <safety@mit.edu>,
        "'sdalton@mit.edu'" <sdalton@mit.edu>,
        "'shyoung@mit.edu'" <shyoung@mit.edu>, "'tiki@mit.edu'" <tiki@mit.edu>,
        "'tquinn@mit.edu'" <tquinn@mit.edu>,
        "'cschultz@mit.edu'"
	 <cschultz@mit.edu>,
        "'dcairns@mit.edu'" <dcairns@mit.edu>,
        "'dlking@mit.edu'" <dlking@mit.edu>, "'dshea@mit.edu'" <dshea@mit.edu>,
        "'dturn@mit.edu'" <dturn@mit.edu>,
        "'e19site@mit.edu'" <e19site@mit.edu>,
        "'elsagt@mit.edu'" <elsagt@mit.edu>, "'esico@mit.edu'" <esico@mit.edu>,
        "'hallisey@mit.edu'" <hallisey@mit.edu>,
        "'honiker@mit.edu'"
	 <honiker@mit.edu>, "'ilf@mit.edu'" <ilf@mit.edu>,
        "'joconor@mit.edu'"
	 <joconor@mit.edu>,
        "'kelley@mit.edu'" <kelley@mit.edu>,
        "'kshooter@mit.edu'" <kshooter@mit.edu>,
        "'lambert@mit.edu'"
	 <lambert@mit.edu>,
        "'mbowers@mit.edu'" <mbowers@mit.edu>,
        "'narbonne@MIT.EDU'" <narbonne@mit.edu>,
        "'opsnote@mit.edu'"
	 <opsnote@mit.edu>,
        "'rberlin@mit.edu'" <rberlin@mit.edu>,
        "'safety@mit.edu'" <safety@mit.edu>,
        "'sfalconi@mit.edu'"
	 <sfalconi@mit.edu>,
        "'tdalton@mit.edu'" <tdalton@mit.edu>, "'tiki@mit.edu'" <tiki@mit.edu>,
        "'tquinn@mit.edu'" <tquinn@mit.edu>,
        "'wbarrett@mit.edu'" <wbarrett@mit.edu>,
        "'wganger@mit.edu'"
	 <wganger@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>,
        "'tr6@mit.edu'" <tr6@mit.edu>, "'jdoucett@mit.edu'" <jdoucett@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
        "'bwinsor@plant.mit.edu'"
	 <bwinsor@PLANT.MIT.EDU>
Date: Thu, 9 May 2002 12:03:44 -0400 
MIME-Version: 1.0
Content-Type: text/plain

> To: 	bengel@mit.edu; dreid@mit.edu; dudley@mit.edu; E-Zone;
> jmganno@mit.edu; lombardo@mit.edu; lstcroix@mit.edu; nsteele@mit.edu;
> safety@mit.edu; sdalton@mit.edu; shyoung@mit.edu; tiki@mit.edu;
> tquinn@mit.edu; cschultz@mit.edu; dcairns@mit.edu; dlking@mit.edu;
> dshea@mit.edu; dturn@mit.edu; e19site@mit.edu; elsagt@mit.edu;
> esico@mit.edu; hallisey@mit.edu; honiker@mit.edu; ilf@mit.edu;
> joconor@mit.edu; kelley@mit.edu; kshooter@mit.edu; lambert@mit.edu;
> mbowers@mit.edu; narbonne@MIT.EDU; opsnote@mit.edu; rberlin@mit.edu;
> safety@mit.edu; sfalconi@mit.edu; tdalton@mit.edu; tiki@mit.edu;
> tquinn@mit.edu; wbarrett@mit.edu; wganger@mit.edu; shutdowns@mit.edu;
> tr6@mit.edu; jdoucett@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; bwinsor@plant.mit.edu
> Subject: 	Bldg. E18 and E19 Hot Domestic, Lab Process and Heating Hot
> Water Shutdown Request
> 
> 
The following Asbestos Removal Notification and hot domestic, lab process
and heating hot water shutdown for Bldgs. E18 and E19 on Wednesday, 5/15 is
for your information.  If you have any questions about this, please contact
Brian Winsor at 8-8788.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: E18 and E19
> Date: 5/15/2002
> Day: Wednesday
> Time: 7 AM - 3 PM 
> System: Medium and low pressure steam as well as condensate return --
> affects Hot Domestic/Hot Lab Process and Heating Hot Water
> Duration: 8 hours
> Reason: 
> Asbestos Removal in E18-011
> 
> Effect: 
> Loss of Heating Hot Water (heat) for Clinical Research Center - E18 - 4th
> floor and E19 - 1st floor or domestic hot water (affects bathroom, kitchen
> and lab sink faucets) or Hot Lab Process Water (affects lab equipment) in
> E18 -  4th floor, Clinical Research Center and E19 - 4th floor. There will
> also be no supply heating via ceiling supply fans in E19 - 6th and 7th
> floors during the shutdown period.
> 
> 