Bldg 7 shutdown request for 5/6/02

daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Tue Apr 30 14:12:40 2002

Message-ID: <568F0AEE7A57D511923900508B556451015623A8@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: arhodes@mit.edu, blose@mit.edu, C-Zone <C-Zone@mit.edu>, ctaylor@mit.edu,
        Cust-Coach <cust-coach@mit.edu>, depopolo@mit.edu, dineend@mit.edu,
        engler@mitvma.mit.edu, fenner@mit.edu, gayle@mit.edu, graposa@mit.edu,
        hlbroder@mit.edu, honda@mit.edu, schedule@mit.edu, shutdowns@mit.edu,
        jbnorman@mit.edu, jobrien@mit.edu, kbarrett@mit.edu, laugh@mit.edu,
        lordjim@mit.edu, mad@mit.edu, mamullow@mit.edu, mdhinkle@mit.edu,
        mwsmith@mit.edu, ncrosby@mit.edu, ndk@mit.edu, rberlin@mit.edu,
        sdl-adm-lib@mit.edu, skendall@mit.edu, slester@mit.edu,
        smathis@mit.edu, strohon@mit.edu, vipinternal@mit.edu, wganger@mit.edu
Cc: shutdown@PLANT.MIT.EDU
Date: Tue, 30 Apr 2002 14:12:33 -0400
MIME-Version: 1.0
Content-Type: text/plain

> To: 	arhodes@mit.edu; blose@mit.edu; C-Zone; ctaylor@mit.edu; Cust-Coach;
> depopolo@mit.edu; dineend@mit.edu; engler@mitvma.mit.edu; fenner@mit.edu;
> gayle@mit.edu; graposa@MIT.EDU; hlbroder@mit.edu; honda@mit.edu;
> schedule@mit.edu; shutdowns@mit.edu; jbnorman@mit.edu; jobrien@mit.edu;
> kbarrett@mit.edu; laugh@mit.edu; lordjim@mit.edu; mad@mit.edu;
> mamullow@mit.edu; mdhinkle@mit.edu; mwsmith@mit.edu; ncrosby@mit.edu;
> ndk@mit.edu; rberlin@mit.edu; sdl-adm-lib@mit.edu; skendall@mit.edu;
> slester@mit.edu; smathis@mit.edu; strohon@mit.edu; vipinternal@mit.edu;
> wganger@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg 7 shutdown request for 5/6/02
> 
> 
The following fire protection water shutdown request is for building 7 on
May 6.  Please let me know if this does or does not meet with your approval.

Thank you
Dawn Simonelli
Repair and Maintenance


> Status: Normal
> Building: 7-145
> Date: 5/6/2002
> Day: Monday
> Time: 7:30 am - 9:30 am
> System: Fire protection water
> Duration: 2 hours
> Reason: 
> To remove 2 sprinkler heads and piping for demolition of mezzanine.
> 
> Effect: 
> There will be a loss of fire protection water during this time.
> 
> 