Bldg. 48 - Emergency Chilled Water Cooling Coil Shutdown

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Apr 19 07:53:28 2002

Message-ID: <568F0AEE7A57D511923900508B55645101231DA2@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
        "'hlbroder@mit.edu'" <hlbroder@MIT.Edu>,
        "'mistetri@mit.edu'"
	 <mistetri@MIT.Edu>,
        "'schedule@mit.edu'" <schedule@MIT.Edu>,
        "'sfrankel@mit.edu'" <sfrankel@MIT.Edu>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.Edu>,
        "'dcosta@mit.edu'" <dcosta@MIT.Edu>,
        "'johnnyd@mit.edu'" <johnnyd@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@MIT.Edu>,
        Joe Comoletti
	 <jcomolet@PLANT.MIT.EDU>,
        Paul Stordy <PStordy@PLANT.MIT.EDU>,
        Operators
	 <Operators@PLANT.MIT.EDU>,
        John Denucce <jdenucce@PLANT.MIT.EDU>,
        David Ferrante <dferrant@PLANT.MIT.EDU>,
        Tom Connolly
	 <tconnoll@PLANT.MIT.EDU>
Date: Fri, 19 Apr 2002 07:53:25 -0400
MIME-Version: 1.0
Content-Type: text/plain

> To: 	B-Zone; Cust-Coach; hlbroder@mit.edu; mistetri@mit.edu;
> schedule@mit.edu; sfrankel@mit.edu; shutdowns@mit.edu; dcosta@mit.edu;
> johnnyd@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; Joe Comoletti; Paul
> Stordy; Operators; John Denucce; David Ferrante; Tom Connolly
> Subject: 	Bldg. 48 - Emergency Chilled Water Cooling Coil Shutdown
> 
> 
The following Emergency chilled water cooling coil shutdown for Bldg. 48 for
today, Friday, 4/19 is for your information.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Emergency
> Building: 48
> Date: 4/19/2002
> Day: Friday
> Time: 8 AM - 4 PM
> System: Chilled Water Cooiling Coil on Roof
> Duration: 8 hours
> Reason: 
> Repair chilled water coil which affects Air Handler 5.
> 
> Effect: 
> Loss of supply ventilation, supply cooling and smoke detectors during the
> 8-hour emergency shutdown period.
> 
> 