[59058] in Hotline Meeting
Bldg 33 - Air Handler 2 Update
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Apr 12 14:59:07 2002
Message-ID: <568F0AEE7A57D511923900508B55645101231D70@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
"'edorsch@mit.edu'" <edorsch@MIT.Edu>,
"'gallant@mit.edu'"
<gallant@MIT.Edu>,
"'graposa@MIT.EDU'" <graposa@MIT.Edu>,
"'schedule@mit.edu'" <schedule@MIT.Edu>,
"'sdl-adm-lib@mit.edu'"
<sdl-adm-lib@MIT.Edu>,
"'src@mit.edu'" <src@MIT.Edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>,
Warren Scott
<WScott@PLANT.MIT.EDU>,
Scott Brenner <sbrenner@PLANT.MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@MIT.Edu>,
"'dcosta@mit.edu'"
<dcosta@MIT.Edu>,
Operators <Operators@PLANT.MIT.EDU>
Date: Fri, 12 Apr 2002 14:59:03 -0400
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Dear Everyone:
I have been informed that upon investigation of the heavy vibration of Air
Handler 2 - it was discovered that a new shaft and bearings were needed.
These parts have been ordered and will arrive tomorrow (Saturday, 4/13), be
installed and Air Handler 2 should be operational by 4 or 5 PM.
This is for your information.
Andrea Nichols
Repair and Maintenance
8-7872