[58468] in Hotline Meeting
Bldgs. E23 and E25 Pump, Fans, Comprssors, Vacuum Systems Shutdow
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Feb 27 08:21:54 2002
Message-ID: <568F0AEE7A57D511923900508B5564511564F4@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'dwye@med.mit.edu'" <dwye@med.mit.edu>,
"'edwa@med.mit.edu'"
<edwa@med.mit.edu>,
"'roge@med.mit.edu'" <roge@med.mit.edu>,
"'tquinn@mit.edu'" <tquinn@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'andrea@psyche.mit.edu'" <andrea@psyche.mit.edu>,
"'arolle@mit.edu'" <arolle@mit.edu>,
"'bengel@mit.edu'" <bengel@mit.edu>, "'cpoon@mit.edu'" <cpoon@mit.edu>,
"'dreid@mit.edu'" <dreid@mit.edu>, E-Zone <E-Zone@mit.edu>,
"'elworthi@mit.edu'" <elworthi@mit.edu>,
"'graposa@MIT.EDU'" <graposa@mit.edu>,
"'hegarty@mit.edu'"
<hegarty@mit.edu>,
"'jmganno@mit.edu'" <jmganno@mit.edu>,
"'jrauch@mit.edu'" <jrauch@mit.edu>,
"'loudib@mit.edu'" <loudib@mit.edu>,
"'mjudge@mit.edu'" <mjudge@mit.edu>, "'rfink@mit.edu'" <rfink@mit.edu>,
"'schedule@mit.edu'" <schedule@mit.edu>,
"'sdalton@mit.edu'"
<sdalton@mit.edu>,
"'sdl-adm-lib@mit.edu'" <sdl-adm-lib@mit.edu>,
"'shyoung@mit.edu'" <shyoung@mit.edu>, "'tiki@mit.edu'" <tiki@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'jlm@mit.edu'"
<jlm@mit.edu>
Date: Wed, 27 Feb 2002 08:21:50 -0500
MIME-Version: 1.0
Content-Type: text/plain
> To: dwye@med.mit.edu; edwa@med.mit.edu; roge@med.mit.edu;
> tquinn@mit.edu; shutdowns@mit.edu; andrea@psyche.mit.edu; arolle@mit.edu;
> bengel@mit.edu; cpoon@mit.edu; dreid@mit.edu; E-Zone; elworthi@mit.edu;
> graposa@MIT.EDU; hegarty@mit.edu; jmganno@mit.edu; jrauch@mit.edu;
> loudib@mit.edu; mjudge@mit.edu; rfink@mit.edu; schedule@mit.edu;
> sdalton@mit.edu; sdl-adm-lib@mit.edu; shyoung@mit.edu; tiki@mit.edu
> Cc: shutdown@plant.mit.edu; jlm@mit.edu
> Subject: Bldgs. E23 and E25 Pump, Fans, Comprssors, Vacuum Systems
> Shutdown Request
>
>
The following Chilled Water Pump, Fans, Compressors and Vacuum Systems
shutdown request for Bldgs. E23 and E25 on Monday, 3/4 is for your
information and comment. Would you please let me know whether this does or
does not meet with your approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Normal
> Building: E23 and E25
> Date: 3/4/2002
> Day: Monday
> Time: 9 AM - 12 Noon
> System: Chilled Water Pump, Fans, Compressors, Vacuum Systems
> Duration: 3 hours
> Reason:
> Vibration analysis for renovation project. Pieces of equipment may be
> shut-off for 2 to 3 minutes as researcher locates highest sources of
> vibration.
>
> Effect:
> Possible loss (2 to 3 minutes) of chilled water (air conditioning),
> heating hot water (steam heating for buildings), supply ventilation (air
> from outside), supply cooling, supply heating, exhaust laboratory,
> exhaust-general, compressed control, compressed lab and lab vacuum air
> during the shutdown period.
>
>