[58429] in Hotline Meeting
Bldg. NW12 - Hot and Cold Water Shutdown Cancelled
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Feb 21 13:50:28 2002
Message-ID: <568F0AEE7A57D511923900508B5564511564BC@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'devries@mit.edu'" <devries@mit.edu>, "'eslau@mit.edu'"
<eslau@mit.edu>,
"'fredmcw@mit.edu'" <fredmcw@mit.edu>,
"'hallisey@mit.edu'" <hallisey@mit.edu>,
"'jbernard@mit.edu'"
<jbernard@mit.edu>,
"'opsnote@mit.edu'" <opsnote@mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
Stephen McHugh
<smchugh@PLANT.MIT.EDU>,
Jack Allen <jrallen@PLANT.MIT.EDU>
Date: Thu, 21 Feb 2002 13:50:23 -0500
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Dear Everyone:
The hot and cold domestic water shutdown request for Bldg. NW12 for Friday,
2/22 has been cancelled. The broken gate valve was replaced without
shutting the system down.
Thank you for your patience in this matter.
Andrea Nichols
Repair and Maintenance
8-7872