Bldg. 18 - Approved Building Power Shutdown

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Feb 12 14:41:58 2002

Message-ID: <568F0AEE7A57D511923900508B556451156440@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'jcollins@mit.edu'" <jcollins@mit.edu>,
        "'opsnote@mit.edu'"
	 <opsnote@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>,
        "'rdevito@linbeck.com'" <rdevito@linbeck.com>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>, A-Zone <A-Zone@mit.edu>,
        Billy Homeyer <whomeyer@PLANT.MIT.EDU>,
        "'rjwilk@mit.edu'"
	 <rjwilk@mit.edu>
Date: Tue, 12 Feb 2002 14:41:54 -0500
MIME-Version: 1.0
Content-Type: text/plain

> To: 	jcollins@mit.edu; opsnote@mit.edu; shutdowns@mit.edu;
> rdevito@linbeck.com
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; A-Zone; Billy Homeyer;
> rjwilk@mit.edu
> Subject: 	Bldg. 18 - Approved Building Power Shutdown 
> 
> 
The following building power shutdown for Bldg. 18 - 1st and 2nd floor Labs
A, B, C, D, Electric Room., Telephone Room and shafts 2 and 3 on Wednesday,
2/13 is for your information.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Critical
> Building: 18 - 1st and 2nd floor Labs A, B, C, D, Electric Room.,
> Telephone Room and shafts 2 and 3
> Date: 2/13/2002
> Day: Wednesday
> Time: 9:30 AM - 11:30 AM
> System: Building Power 120V - 208V Panels L1A, L1B, L1C, L1D, L104, L2A,
> L2B, L2C and L2D
> Duration: 2 hours
> Reason: 
> Swapping feeds to power panels.
> 
> Effect: 
> Loss of building power to the following rooms in Bldg. 18 - 1st and 2nd
> floor labs, A, B, C, D, Electric Rm. Tel. Rm. and Shafts 2 and 3 during
> the 2-hour shutdown period.
> 
> 