RE: Bldg. W20 Air Handler 9

daemon@ATHENA.MIT.EDU (Warren Scott)
Thu Jan 24 14:43:52 2002

Message-ID: <568F0AEE7A57D511923900508B556451F7A359@PLANT.MIT.EDU>
From: Warren Scott <WScott@PLANT.MIT.EDU>
To: Andrea Nichols <andrea@PLANT.MIT.EDU>,
        "'capone@mit.edu'"
	 <capone@mit.edu>, D-Zone <D-Zone@mit.edu>,
        "'eisen@mit.edu'"
	 <eisen@mit.edu>, "'flett@mit.edu'" <flett@mit.edu>,
        "'lsc@mit.edu'"
	 <lsc@mit.edu>, "'mwf@mit.edu'" <mwf@mit.edu>,
        "'pdc@mit.edu'"
	 <pdc@mit.edu>, "'pwalsh@mit.edu'" <pwalsh@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>,
        Kevin Connolly
	 <kmconnol@PLANT.MIT.EDU>,
        "'johnnyd@mit.edu'" <johnnyd@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
        Operators
	 <Operators@PLANT.MIT.EDU>
Date: Thu, 24 Jan 2002 14:43:48 -0500
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"

The coil hasn't been repaired.  We reconfigured the controls to control the
fan discharge with the preheat coil.  The reheat coil has not been repaired.

Warren

-----Original Message-----
From: Andrea Nichols [mailto:andrea@PLANT.MIT.EDU]
Sent: Thursday, January 24, 2002 2:25 PM
To: 'capone@mit.edu'; D-Zone; 'eisen@mit.edu'; 'flett@mit.edu';
'lsc@mit.edu'; 'mwf@mit.edu'; 'pdc@mit.edu'; 'pwalsh@mit.edu';
'shutdowns@mit.edu'; Kevin Connolly; 'johnnyd@mit.edu'
Cc: 'shutdown@plant.mit.edu'; 'rm-shutdown@mit.edu'; Operators
Subject: Bldg. W20 Air Handler 9
Importance: High


Dear Everyone:

I have been informed that Fan Supply/Air Handler 9 - PM#703534 is now back
on line and all alarms should be addressed.  The steam coil had broken on
11/14/01.  It has now been replaced. 

Thank you for your patience in this matter.

Andrea Nichols