[5187] in Hotline Meeting
A/C Work order for 4-034:
daemon@ATHENA.MIT.EDU (larugsi@ATHENA.MIT.EDU)
Tue May 21 18:04:48 1991
From: larugsi@ATHENA.MIT.EDU
To: hotline@ATHENA.MIT.EDU
Date: Tue, 21 May 91 18:04:27 EDT
------- Forwarded Message
Received: by E40-PO.MIT.EDU (5.45/4.7) id AA25769; Tue, 21 May 91 15:18:13 EDT
Received: from ANGLER-B-T.MIT.EDU by ATHENA.MIT.EDU with SMTP
id AA24677; Tue, 21 May 91 15:18:10 EDT
From: jjmorey@ATHENA.MIT.EDU
Received: by angler-b-t.MIT.EDU (5.61/4.7) id AA05112; Tue, 21 May 91 15:18:05 -0400
Message-Id: <9105211918.AA05112@angler-b-t.MIT.EDU>
To: larugsi@ATHENA.MIT.EDU
Cc: cc@ATHENA.MIT.EDU, rita@ATHENA.MIT.EDU, carlton@ATHENA.MIT.EDU,
len@ATHENA.MIT.EDU
Subject: AC in M4-034
Date: Tue, 21 May 91 15:18:02 EDT
I have placed a work order for the 2 AC units in M4-034. They have been
dripping for awhile now, and the humidity in the room is unreal. There was
a tech already there from Physical Plant. Also pointed out the dripping pipes
behind the small door in the back of the room. Tech stated that they are
aware of this problem but the pipes are covered with asbestos and will have
to be removed professional before pipes can be repaired.
- --jjmorey
------- End of Forwarded Message