Re: Bldg. E40 - 7/22 - Electrical (120/208V) Shutdown Request

daemon@ATHENA.MIT.EDU (Jonathon Weiss)
Wed Jul 19 14:29:45 2000

Message-Id: <200007191829.OAA05163@detraction.mit.edu>
From: Jonathon Weiss <jweiss@MIT.EDU>
To: Andrea Nichols <andrea@PLANT.MIT.EDU>
Cc: ops@MIT.EDU, network@MIT.EDU, shutdowns@MIT.EDU
In-Reply-To: Your message of "Wed, 19 Jul 2000 13:20:51 EDT."
             <82F0D564C5ADD31180EF00508B556451105096@PLANT.MIT.EDU> 
Date: Wed, 19 Jul 2000 14:29:40 -0400


Hi Andrea,

As you may know, IS is in the process of moving off of the 3rd floor
of e40.  Most people will be moving on Tuesday and Wednesday of next
week, and any electrical shutdown before then will be impossible for
us to deal with.  Additionally, we are going to have many servers in
the basement of e40 (e40-008 in particular) which we ar going to
continue to have at least through the end of January, and quite
possibly for much longer than that.  As with w20-575a, if power to
this room is affected, we will need to make alternate power and
cooling arrangements.  Unfortunately, e40-008 is significantly bigger
than w20-575a, so this may be a harder problem.  Either way, I don;t
think there's any way we can be ready for this by this weekend.

In short, if this outage affects either the 3rd floor or the basement,
and the description implies to me that it does, we need to
re-schedule.

	Jonathon



> The following electrical (120/208V) shutdown request for Bldg. E40 on
> Saturday, July 22 is for your information and comment.  Would you please let
> me know whether this does or does not meet with your approval.
> 
> Thank you.
> 
> Andrea Nichols
> Operations Center
> 8-7872
> 
> > Status: Normal
> > Building: E40
> > Date: 7/22/00
> > Day: Saturday
> > Time: 7:30 AM - 11:30 AM
> > System: Electrical (120/208V) - Riser bus duct 2nd floor electrical room
> > Duration: 4 hours
> > Reason: 
> > Adding bus duct switch for new 120 Volt panel.
> > 
> > Effect: 
> > Loss of power:  access controls (supply ventilation, supply cooling,
> > supply heating), building power, freight elevator, computers and lighting
> > during the 4-hour shutdown period.
> > 
> > 