[51400] in Hotline Meeting
Bldg 10 1st & 2nd floor chilled water shutdown on 7/22
daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Mon Jul 17 09:48:13 2000
Message-ID: <82F0D564C5ADD31180EF00508B5564517540EF@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: admitmr@mitvmc.mit.edu, andreab@mit.edu, C-Zone <C-Zone@mit.edu>,
chambe@mit.edu, Cust-Coach <cust-coach@mit.edu>, dfucillo@mit.edu,
engler@mitvma.mit.edu, fin@mit.edu, granvill@mit.edu, isabella@mit.edu,
jgk@mit.edu, jobrien@mit.edu, kates@mit.edu, lees@mit.edu, lkn@mit.edu,
lsc@mit.edu, mcoleman@mit.edu, mleen@mit.edu, ndk@mit.edu,
rrhonda@mit.edu, ryan@mit.edu, schedule@mit.edu, sdl-adm-lib@mit.edu,
sexton@mit.edu, vipinternal@mit.edu, archall@mit.edu,
shutdowns@mit.edu
Cc: shutdown@PLANT.MIT.EDU
Date: Mon, 17 Jul 2000 09:45:27 -0400
MIME-Version: 1.0
Content-Type: text/plain
> To: admitmr@mitvmc.mit.edu; andreab@mit.edu; C-Zone; chambe@mit.edu;
> Cust-Coach; dfucillo@mit.edu; engler@mitvma.mit.edu; fin@mit.edu;
> granvill@mit.edu; isabella@mit.edu; jgk@mit.edu; jobrien@mit.edu;
> kates@mit.edu; lees@mit.edu; lkn@mit.edu; lsc@mit.edu; mcoleman@mit.edu;
> mleen@mit.edu; ndk@mit.edu; rrhonda@mit.edu; ryan@mit.edu;
> schedule@mit.edu; sdl-adm-lib@mit.edu; sexton@mit.edu;
> vipinternal@mit.edu; archall@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg 10 1st & 2nd floor chilled water shutdown on 7/22
>
>
The following shutdown request in building 10 on 7/22 is for chilled water
(air conditioning). This will be for 8 and a half hours. Please let me
know if this does or does not meet your approval.
Thank you.
Dawn Simonelli
Repair and Maintenance
2-1599
> Status: Normal
> Building: 10 1st & 2nd floor
> Date: 7/22/00
> Day: Saturday
> Time: 7:00 am to 3:30 pm
> System: chilled water
> Duration: 8 1/2 hours
> Reason:
> the removal of existing fan coil unit in building 10 on the second floor.
>
> Effect:
> loss of chilled water ( air conditioning) during the shutdown period.
>
>