[51367] in Hotline Meeting
Bldg. E56 - 7/17 PM - 7/18 AM - Critical All Bldg. Power Shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Jul 12 15:04:45 2000
Message-Id: <82F0D564C5ADD31180EF00508B556451105041@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'esimha@mit.edu'"
<esimha@MIT.EDU>, "'gwj@mit.edu'" <gwj@MIT.EDU>,
"'lhill@mit.edu'"
<lhill@MIT.EDU>,
"'mscoppa@mit.edu'" <mscoppa@MIT.EDU>,
"'schedule@mit.edu'" <schedule@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
E-Zone
<E-Zone@MIT.EDU>
Date: Wed, 12 Jul 2000 15:04:14 -0400
Mime-Version: 1.0
Content-Type: text/plain
> To: shutdowns@mit.edu; esimha@mit.edu; gwj@mit.edu; lhill@mit.edu;
> mscoppa@mit.edu; schedule@mit.edu
> Cc: shutdown@plant.mit.edu; E-Zone
> Subject: Bldg. E56 - 7/17 PM - 7/18 AM - Critical All Bldg. Power
> Shutdown Request
>
>
The following Critical All Building Power Shutdown Request for Bldg. E56 as
per Comm Electric on Monday, July 17 PM to Tuesday, July 18 AM (Rain date of
7/18 PM - 7/19 AM) is for your review and comment. Would you please let me
know whether this does or does not meet with your approval.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Critical
> Building: E56
> Date: 7/17/18
> Day: Monday
> Time: 7/17 (5 PM) - 7/18 (7 AM) or 7/18 PM-7/19 AM Rain Date
> System: All Building Power
> Duration: 14 hours
> Reason:
> Repair leaking transformer. Two shutdowns will be required for short
> duration. This is at the request of Comm. Electric.
>
> Effect:
> Loss of Building Power: Access Controls, elevators, computers, lighting;
> Air: Supply ventilation, supply cooling, exhaust-general, exhaust-toilet
> and compressed control air during the shutdown period.
>
>