[51196] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldgs. 37and 31 (480V) 6/29-30 - Normal Electrical Power Shutdown

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Jun 19 09:38:33 2000

Message-Id: <82F0D564C5ADD31180EF00508B556451104EDA@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'schedule@mit.edu'" <schedule@MIT.EDU>,
        "'shutdowns@it.edu'"
	 <shutdowns@it.edu>,
        "'ameswf@mit.edu'" <ameswf@MIT.EDU>,
        "'pcollymo@mit.edu'" <pcollymo@MIT.EDU>,
        "'dickp@it.edu'" <dickp@it.edu>, "'davies@mit.edu'" <davies@MIT.EDU>,
        "'erwent@mit.edu'" <erwent@MIT.EDU>,
        "'stiffler@mit.edu'" <stiffler@MIT.EDU>,
        "'emcmill@mit.edu'"
	 <emcmill@MIT.EDU>,
        "'cmo@space.mit.edu'" <cmo@space.mit.edu>,
        "'breslau@spae.mit.edu'" <breslau@MEGALOMANIAC.MIT.EDU>,
        "'murphy@space.mit.edu'"
	 <murphy@space.mit.edu>,
        "'pbauer@mit.edu'" <pbauer@MIT.EDU>, "'thane@mit.edu'" <thane@MIT.EDU>,
        "'gallant@mit.edu'" <gallant@MIT.EDU>,
        "'epwarren@mit.edu'" <epwarren@MIT.EDU>,
        "'benford@space.mit.edu'"
	 <benford@space.mit.edu>,
        "'rcf@space.mit.edu'" <rcf@space.mit.edu>,
        "'jweiss@mit.edu'" <jweiss@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
        B-Zone
	 <B-Zone@MIT.EDU>
Date: Mon, 19 Jun 2000 09:32:41 -0400
Mime-Version: 1.0
Content-Type: text/plain

> To: 	schedule@mit.edu; shutdowns@it.edu; ameswf@mit.edu;
> pcollymo@mit.edu; dickp@it.edu; davies@mit.edu; erwent@mit.edu;
> stiffler@mit.edu; emcmill@mit.edu; cmo@space.mit.edu;
> breslau@spae.mit.edu; murphy@space.mit.edu; pbauer@mit.edu; thane@mit.edu;
> gallant@mit.edu; epwarren@mit.edu; benford@space.mit.edu;
> rcf@space.mit.edu; jweiss@mit.edu
> Cc: 	shutdown@plant.mit.edu; B-Zone
> Subject: 	Bldgs. 37and 31 (480V) 6/29-30 - Normal Electrical Power
> Shutdown Request - Phase 2 
> 
> 
The following Bldg. 37 and 31 (480V) Normal Electrical Power Shutdown
Request - 2 for Thursday, 6/29 and Friday, 6/30 is for your review.  Would
you please let me know whether this does or does not have your approval.

Thank you.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: 37 and 31
> Date: 6/29/30
> Day: Thursday
> Time: 5 PM *(6/29) - 1 AM (6/30) *Can begin at 7 PM on 6/29 if necessary.
> System: Normal Electrical Power and 480V in Bldg. 31
> Duration: 8 hours
> Reason: 
> Second shutdown request out of three to replace high voltage substation
> switches.
> 
> Effect: 
> Loss of normal electrical power in Bldg. 37 (i.e., access controls,
> building power (supply ventilation), elevators, computers, lighting in
> corridors and stairs (with the exception of athena rooms). Loss of 480V
> power in Bldg. 31 (equipment or machinery) operated by 480V.
> 
> 