Bldg. 9 - 2/10 PM - 2/11 AM - All Normal Electrical Power Revise

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jan 28 08:16:15 2000

Message-Id: <82F0D564C5ADD31180EF00508B556451104883@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'mshiffer@mit.edu'" <mshiffer@MIT.EDU>,
        "'dineend@mit.edu'"
	 <dineend@MIT.EDU>,
        "'engler@mit.edu'" <engler@MIT.EDU>,
        "'jobrien@mit.edu'" <jobrien@MIT.EDU>,
        "'mlavalle@mit.edu'"
	 <mlavalle@MIT.EDU>,
        "'ndk@mit.edu'" <ndk@MIT.EDU>, "'randy@mit.edu'"
	 <randy@MIT.EDU>,
        "'sexton@mit.edu'" <sexton@MIT.EDU>, "'src@mit.edu'"
	 <src@MIT.EDU>,
        "'vjames@mit.edu'" <vjames@MIT.EDU>,
        "'opsnote@mit.edu'"
	 <opsnote@MIT.EDU>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
        "'westlund@mit.edu'" <westlund@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Fri, 28 Jan 2000 08:13:21 -0500
Mime-Version: 1.0
Content-Type: text/plain

> To: 	mshiffer@mit.edu; dineend@mit.edu; engler@mit.edu; jobrien@mit.edu;
> mlavalle@mit.edu; ndk@mit.edu; randy@mit.edu; sexton@mit.edu; src@mit.edu;
> vjames@mit.edu; opsnote@mit.edu; shutdowns@mit.edu; westlund@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 9 -  2/10 PM - 2/11 AM - All Normal Electrical Power
> Revised Shutdown Request
> 
> 
The following All Normal Electrical Power shutdown request for Bldg. 9 has
now been rescheduled to Thursday, 2/10 PM to Friday, 2/11 AM.  Would you
please let me know if the revised dates and time would better fit in with
your schedules.

Thank you again and I look forward to hearing from you.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building:   9   
> Date: 2/10/11
> Day: Thursday
> Time: 11:30 PM (2/10) - 6:30 AM (2/11)
> System: Normal Electrical Power
> Duration: 7 hours
> Reason: 
> Replace high voltage switch - shutdown 1 of 3. - No HVAC during power
> outage - only Emergency power.
> 
> Effect: 
> Loss of Power:  building power, elevatores, computers, telephones,
> lighting in corridors & stairs; Air:  supply ventilation, supply cooling,
> supply heating, exhaust-laboratory, exhaust-general, exhaust-toilet,
> compressed control air.
> 
> 