RE: FCS2 - Emergency Shutdown - 1/11/00
daemon@ATHENA.MIT.EDU (Joe Kay)
Tue Jan 11 20:53:44 2000
Message-Id: <82F0D564C5ADD31180EF00508B5564512647A4@PLANT.MIT.EDU>
From: Joe Kay <jakay@PLANT.MIT.EDU>
To: ftilley@MIT.EDU, "'jmganno@mit.edu'" <jmganno@MIT.EDU>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'lambert@mit.edu'"
<lambert@MIT.EDU>,
"'mcgrath@mtl.mit.edu'" <mcgrath@mtl.mit.edu>,
"'lukeohane@mit.edu'" <lukeohane@MIT.EDU>,
"'natkin@hq.lcs.mit.edu'"
<natkin@hq.lcs.mit.edu>,
"'dcrvo@mit.edu'" <dcrvo@MIT.EDU>,
Andrea Nichols <andrea@PLANT.MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
"'rm-shutdown@mit.edu'" <rm-shutdown@MIT.EDU>,
Joe Kay
<jakay@PLANT.MIT.EDU>
Date: Tue, 11 Jan 2000 20:51:12 -0500
Mime-Version: 1.0
Content-Type: multipart/mixed;
boundary="----_=_NextPart_000_01BF5C9F.86AB53D6"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_000_01BF5C9F.86AB53D6
Content-Type: text/plain
The following shutdown notice from 1:49pm was actually referring to only
PART of the FCS2 monitoring system, namely the E40 building, which includes
also the East Chill Water Plant (ECP) in its basement. One data concentrator
(for E40) is down, for an unknown duration, which prevents the Operations
Center or Central Utilities from monitoring or overriding various HVAC
systems. The ECP will be monitored by other means. The areas outside E40
monitored by FCS2 are unaffected; and in E40 it is not a loss of control but
of communication. Systems in E40 may well continue to run satisfactorily;
but we will need to find out when they fail by using non-automated means,
including inspections by customer and/or Facilities personnel. Sorry for
the confusion.
In E40 we will be relying on you (the customer) for greater watchfulness of
impending and actual problems; if you come across problems (such as
leaks/floods/lack of heating or cooling) please call the Operations Center
at FIXIT (3-4948), as usual.
A second shutdown notice, at 2:30pm, went to some of you with the correct
description of the area affected; I am attempting to include it here as an
attachment, for the rest of you. If the FCS2 problem cannot be repaired, at
some point some other automated system would be installed; a repair would be
quicker (if possible at all), but not necessarily "quick".
<<Bldg. E40 and East Chill Water Plant - 1/11 - Emergency Shutdown>>
"FCS" stands for Facilities Control Systems, and is intended for Energy
Management and mechanical-system problem detection/diagnosis. FCS2 is the
oldest of several such systems monitored by the Department of Facilities.
----------
From: Andrea Nichols [SMTP:andrea@PLANT.MIT.EDU]
Sent: Tuesday, January 11, 2000 1:49 PM
To: 'jmganno@mit.edu'; 'shutdowns@mit.edu'; 'lambert@mit.edu';
'mcgrath@mtl.mit.edu'; 'lukeohane@mit.edu'; 'natkin@hq.lcs.mit.edu';
'dcrvo@mit.edu'
Cc: 'shutdown@plant.mit.edu'; 'rm-shutdown@mit.edu'; Joe Kay
Subject: FCS2 - Emergency Shutdown - 1/11/00
Importance: High
> To: jmganno@mit.edu; shutdowns@mit.edu; lambert@mit.edu;
> mcgrath@mtl.mit.edu; lukeohane@mit.edu; natkin@hq.lcs.mit.edu;
> dcrvo@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; Joe Kay
> Subject: FCS2 - Emergency Shutdown - 1/11/00
>
>
The following Emergency shutdown information pertaining to FCS2 is
for your
information. if you have any questions about this, please contact
Mr. Joe
Kay at 3-3967.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Emergency
> Building: FCS2
> Date: 1/11/00
> Day: Tuesday
> Time: 1:30 PM - unknown
> System: FCS2 Campus Monitoring System
> Duration: unknown
> Reason:
> The FCS2 System is down - reason unknown.
>
> Effect:
> Loss of FCS2 alarm monitoring system back to Operations Center
during
> shutdown period. The groups involved must monitor their own spaces
during
> the duration of the shutdown.
>
>
------_=_NextPart_000_01BF5C9F.86AB53D6
Content-Type: message/rfc822
Content-Description: Bldg. E40 and East Chill Water Plant - 1/11 - Emergency Shutdown
Message-ID: <82F0D564C5ADD31180EF00508B5564511047CC@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'lhill@mit.edu'" <lhill@MIT.EDU>, "'mosley@mit.edu'" <mosley@MIT.EDU>,
"'foglia@mit.edu'" <foglia@MIT.EDU>, "'lmannion@mit.edu'"
<lmannion@MIT.EDU>, "'jfob@mit.edu'" <jfob@MIT.EDU>,
"'dcrovo@plant.mit.edu'" <dcrovo@plant.mit.edu>, "'dcarlson@mit.edu'"
<dcarlson@MIT.EDU>, "'cappucci@mit.edu'" <cappucci@MIT.EDU>,
"'jfreeman@mit.edu'" <jfreeman@MIT.EDU>, "'mmahoney@mit.edu'"
<mmahoney@MIT.EDU>, Joe Kay <jakay@PLANT.MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
"'rm-shutdown@mit.edu'" <rm-shutdown@MIT.EDU>, E-Zone <E-Zone@MIT.EDU>
Subject: Bldg. E40 and East Chill Water Plant - 1/11 - Emergency Shutdown
Date: Tue, 11 Jan 2000 14:31:38 -0500
MIME-Version: 1.0
X-Mailer: Internet Mail Service (5.5.2650.21)
Content-Type: text/plain;
charset="iso-8859-1"
> To: lhill@mit.edu; mosley@mit.edu; foglia@mit.edu; lmannion@mit.edu;
> jfob@mit.edu; dcrovo@plant.mit.edu; dcarlson@mit.edu; cappucci@mit.edu;
> jfreeman@mit.edu; mmahoney@mit.edu; Joe Kay
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; E-Zone
> Subject: Bldg. E40 and East Chill Water Plant - 1/11 - Emergency
> Shutdown
>
>
The following Emergency shutdown for Bldg. E40 and East Chill Water Plant
for today, Tuesday, 1/11 is for your information.
If you have any questions about this, please contact Joe Kay at 3-3967.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Emergency
> Building: E40 and East Chill Water Plant
> Date: 1/11/00
> Day: Tuesday
> Time: 1:30 PM - unknown
> System: FCS2 Monitoring System
> Duration: unknown
> Reason:
> Communication lost to data concentrator - repairs may not be possible , at
> least not soon.
>
> Effect:
> Loss of FCS2 monitoring of E40 and East Chill Water Plant. E40 includes
> Air Handler 1, CV1, sump level, steam system and 2 athena/IS room
> temperatures.
>
>
------_=_NextPart_000_01BF5C9F.86AB53D6--