Emergency Power System - 1/13 PM - 1/14 AM - Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jan 7 15:39:43 2000

Message-Id: <82F0D564C5ADD31180EF00508B556451104793@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'schedule@mit.edu'" <schedule@MIT.EDU>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.EDU>,
        "'andreab@mit.edu'" <andreab@MIT.EDU>,
        "'pmccosco@mit.edu'" <pmccosco@MIT.EDU>,
        "'mgibson@mit.edu'"
	 <mgibson@MIT.EDU>,
        "'magowen@mit.edu'" <magowen@MIT.EDU>,
        "'mamullow@mit.edu'" <mamullow@MIT.EDU>,
        "'patdixon@mit.edu'"
	 <patdixon@MIT.EDU>,
        "'fenner@mit.edu'" <fenner@MIT.EDU>,
        "'duggins@math.mit.edu'" <duggins@math.mit.edu>,
        "'tivon@math.mit.edu'"
	 <tivon@math.mit.edu>,
        "'akelsey@mit.edu'" <akelsey@MIT.EDU>, "'mbj@mit.edu'" <mbj@MIT.EDU>,
        "'daisymae@math.mit.edu'"
	 <daisymae@math.mit.edu>,
        "'wjfitz@mit.edu'" <wjfitz@MIT.EDU>, "'mward@mit.edu'" <mward@MIT.EDU>,
        "'jobrien@mit.edu'" <jobrien@MIT.EDU>, "'dory@mit.edu'" <dory@MIT.EDU>,
        "'tetaylor@mit.edu'" <tetaylor@MIT.EDU>,
        "'arch-all@mit.edu'" <arch-all@MIT.EDU>,
        "'cust-coach@mit.edu'"
	 <cust-coach@MIT.EDU>,
        "'alexnow@mit.edu'" <alexnow@MIT.EDU>,
        "'dimond@mit.edu'" <dimond@MIT.EDU>,
        "'graham@mit.edu'" <graham@MIT.EDU>,
        "'ccarey@mit.edu'" <ccarey@MIT.EDU>, "'krf@mit.edu'" <krf@MIT.EDU>,
        "'molecan@mit.edu'" <molecan@MIT.EDU>,
        "'jcentor@mit.edu'"
	 <jcentor@MIT.EDU>,
        "'dineend@mit.edu'" <dineend@MIT.EDU>, "'frc@mit.edu'" <frc@MIT.EDU>,
        "'griffin@mit.edu'" <griffin@MIT.EDU>,
        "'naylor@mit.edu'" <naylor@MIT.EDU>,
        "'rrhonda@mit.edu'"
	 <rrhonda@MIT.EDU>,
        "'sandylo@mit.edu'" <sandylo@MIT.EDU>,
        "'menos@mit.edu'" <menos@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@MIT.EDU>,
        "'wpwohlfa@mit.edu'"
	 <wpwohlfa@MIT.EDU>
Date: Fri, 7 Jan 2000 15:37:21 -0500 
Mime-Version: 1.0
Content-Type: text/plain

Utilities need to complete the few remaining tests of the upgraded CUP
emergency power system, which was not  accomplished on December 22..

	>Testing of the Central Utilities Plant Emergency Power System will
be as follows:
	>
	>Thursday January 13th 9pm to Friday January 14th 3am
	>
	>Interruptions to emergency power (exit signs and emergency
lighting) will
	>occur for minimum durations of 10 seconds to maximum durations of
30 minutes
	Most durations will be under 5 minutes... but
should
	>some tests initiate system failures, outage duration's could be 30
minutes
	>before emergency power is restored
	>
	>Buildings Affected:
	>
	
1,2,3,4,5,6,6A,7,7A,8,9,10,11,12,13,14,15,18,24*,26,31,33,34,35,36*,37,38,3
9
	>*,50,54,62,64,E17, E18,E19,N9**, N10**.
	>
	>Notes:
	>
	>* Buildings 24, 36, 39 have transfer switches that will be placed
in
	>"manual-normal power " by Facilities personnel to avoid multiple
transfers
	>and interruptions.
	>
	>** Building N9 and N10 will have normal power affected by this
testing. All
	>power in N9 and N10 is presently on the emergency power loop.
	>
	>The following two motors will be shutdown for the duration of the
testing.
	>
	>    Building 31 - 1500 HP Gas Turbine Lab Compressor (Breaker
24A5).
	>    Building 17 - 2000 HP Wind Tunnel Motor  (Breaker 24B5).
	>
	>Any questions or comments can be directed to;
	>
	>William P. Wohlfarth, P.E. - NSPE
	>Senior Electrical Engineer
	>wpwohlfa@mit.edu <mailto:wpwohlfa@mit.edu <mailto:wpwohlfa@mit.edu
<mailto:wpwohlfa@mit.edu> >

	>3-1741